Project-wise Anticipated Investment in Public Sector under Consideration on Project Monitoring - Invest India Cell (PMIC) In India (As on 26.06.2019) | |||
Project | Sponsoring Ministry | Location | Anticipated Investment (Rs in Crore) |
Implementation of Transmission Systems in the State of Jharkhand consisting of 400/220/132/33 kV transmission lines and substations under Jharkhand Consultancy Project. | |||
Gadarwara STPP | |||
Multi Modal Transport System (MMTS) Phase-II Hyderabad | |||
Dangoaposi-Rajkharswan 3rd Line Doubling | |||
Khagaria-Kusheshwar Asthan (NL) | |||
Bowaichandi-Arambagh | |||
Phulera-Digana Doubling | |||
Bhadrachalam Road- Sattupalli | |||
Banspani-Jakhpura Doubling | |||
Rourkela-Jharsuguda Third Line 101 Km | |||
Maniyachi-Nagercoil (102 Km) Doubling | |||
GAYA-CHATRA (NL) | |||
Chhindwara Nainpur Mandla Fort Gauge Conversion Project | |||
Vijaywada-Gudur | |||
Augmentation of Paradip Haldia Durgapur LPG Pipeline and its extension up to Patna and Muzaffarpur | |||
Koyali- Ahmednagar- Solapur Pipeline | |||
Paradip-Hyderabad Pipeline | |||
Strengthening of Transmission System beyond Vemagiri | |||
Dwarka Expressway NHAI project | |||
Creation of Intra-State Transmission System In Eight Renewable Energy Rich States | |||
Advanced Ultra Supercritical (AUSC) Technology | |||
Kharagpur-Adityapur Third Rail Line: 132 Km | |||
Doubling of Hubli-Chikjajur Rail Line: 190 Km | |||
Establishment of 220/66 kV, 2x160 MVA GIS Substation at UT Chandigarh and 220 kV D/C line from Chandigarh to Panchkula | |||
Koraput - Singapur Road Doubling | |||
Agartala-Akhaura Nl | |||
Jarapada - Budhapank With Fly Over At Talcher Road 3Rd and 4Th Line | |||
Bhadrak - Nergundi 3Rd Line | |||
Digaru-Hojai (102 Km) | |||
Kalinarayanpur-Krishnanagar Doubling Alongwith Krishnanagar - Chapra New Line and Naihati-Ranaghat 3 | |||
Rajnandgaon - Nagpur - 3Rd Line (SECR) | |||
New B.G. Line From Araria To Galgalia (Thakurgung), NEFR | |||
Gulabpura to Chittorgarh Bypass section | |||
Tonk Sawaimadhopur | |||
6-laning of Gorhar to Khairatunda Section | |||
Construction of NH-4B from Km 21.200 to Km 27.270 and from Km 0.000 to Km 4.492 | |||
Construction of NH-348A and Amra Marg (Package - III) | |||
Gorhar to Khairatunda Section | |||
Govindpur (Rajgunj) - Chas - West Bengal Border section | |||
Bijupara to Kuru Section | |||
Kutchery Chowk Ranchi to Bijupara section | |||
Ranchi Rargaon-Mahulia Section | |||
Sultanpur-Varanasi Section | |||
Kaithlighat to Dhalli Section | |||
Solan to Kaithlighat Section | |||
Programme of Ministry of Home Affairs For Indo-Bangladesh Border (IBB) | |||
Four Laning of Ambala-Kaithal Section of Nh-65: 95 Km | |||
Four Laning of Nerchowk-Pandoh (Including Pandoh Bypass) Section of Nh-21: 26 Km | |||
Master Plan For Jharia | |||
Four Laning of Udhampur-Chenani and Nashri-Ramban of Nh-44: 43 Km | |||
Pune Metro Rail Project (Phase-I): 31 Km | |||
Transmission System associated with Kishenganga HEP [3x110 MW] - Project Cost Rs. 340.88 Crs. | |||
Katni Grade Separator/Bye Pass | |||
New Bg Rly Line From Eklakhi-Balurghat Including Gazole-Itahar(NL),NEFR | |||
Hathua-Bhatni (N L) (NER) | |||
Secunderabad-Mahabubnagar Doubling | |||
Rosa-Sitapur Cantt-Burhwal Doubling | |||
Palanpur-Samakhayali (DL) | |||
Tamluk Digha 88.9 Km With Mm Deshpran Nandigram 18.5 Km Mm Kanthi Egra 26.2 Km Nadakumar Bolai | |||
Bondamunda Ranchi Doubling | |||
Mau-Ghazipur-Tarighat New Line | |||
Kotlpalli-Narasapur (NL) (SCR) | |||
Guntur-Guntakal | |||
Four Laning of Chutmalpur-Ganeshpur and Roorkee-Chutmalpur- Saharanpur-Yamunanagar Section of Nh-72A and 73: 104 Km | |||
Four Laning of Biramitrapur To Brahmani By-Pass end Section of Nh-23: 29 Km | |||
Doubling of New Bongigaon To Kamakhya Via Goalpara: 176 Km | |||
Doubling of Surendranagar-Rajkot Rail Line: 116 Km | |||
Wardha - Nagpur - 4Th Line (76 Km) | |||
Mathura-Plwal 4Th Line (80Km) | |||
Magrahat-Diamond Harbour With Mm Sangrampur- Krishanchandpur and Diamond Hatbour - Bahrahat-KULPI NL | |||
Pachhwara North (Sch.- II) | |||
Wardha-Sewagram Ngp 3Rd Line | |||
Arsikere-Tumkur | |||
Kalyan-Kasara 3Rd Line | |||
Miyagam-Karjan-Dabhoi-Samlaya (GC) | |||
Rajkot-Veraval,Wansjalia To Jatalsar With New Mm For Shapur-Saradiya and Somnath-Kodinar (Gc) | |||
Yelahanka-Penukonda | |||
Bagalkot-Kudachi NL | |||
Miraj-Londa | |||
Manmad - Jalgaon - 3Rd Line (160 Km) | |||
Wardha-Balharshah - 3Rd Line (132 Km) | |||
Hotgi-Kudgi-Gadag | |||
Kazipet-Balhrsha | |||
Itarsi-Nagpur (Bal.) - 3Rd Line (267 Km) | |||
Pune-Miraj (467 Km) | |||
Gwalior-Seopurkala With Extension To Kota (Gc) | |||
Establishment of New Medical Colleges Attached With Existing States/UTs/Referral Hospitals Phase-Ii | |||
Rishikesh-Karnaprayag New Rail Line: 125 Km | |||
Doubling of Kottavalasa-Koraput Rail Line: 189 Km | |||
Doubling of Ramna-Singrauli Rail Line: 160 Km | |||
Four Laning of Parwanoo-Solan Section of Nh-22 39 Km | |||
Four/Six Laning of Raipur-Bilaspur Section Of Nh-30 and 130 : 126 Km | |||
Transmission System under Green Energy Corridors - Part-C : Inter State Transmission Scheme (ISTS) | |||
National Highway from Bellary (Km 253.600) to Hiriyur (Km 413.500) section of NH150A | |||
Banglore to Mysore NH 275 | |||
Four Laning of Aligarh-Kanpur Section of Nh-91: 274 Km | |||
Rampur Dumra- Tal-Rajendrapul Additional Bridge and Doubling | |||
3Rd 4Th Rail Line Between Budhapank Salegaon: 170 Km | |||
Varansi-Dagmagpur-Lalganj-Hanumana | |||
400 Kv D/C Teesta Iii-Kishanganj Transmission Line : 214 Km | |||
Ahemdabad Metro Rail Project (Phase-I) : 36 Km | |||
Mumbai-Ahmedabad High Speed Rail Project: 508 Km | |||
Vizianagaram-Sambalpur (Titlagarh) 3Rd Line (Bg) : 265 Km | |||
Four Laning of Lucknow To Sultanpur Section of Nh-56 : 127 Km | |||
Construction of Left Out Work of Junahgadh Bypass In The State of Gujarat | |||
Construction of Elevated Corridor Partially Access Controlled Highway From Samrala Chowk At Km 76+000 To Km 85+980 of Nh-95 (Section Passing Through Ludhiana City) In The State of Punjab | |||
4/6 laning of Chandigarh-Kharar Section from Sector-39 (Round about) at Chandigarh (Km. 0.00) to Kharar (Km 10.185) | |||
Rehabilitation and Up-gradation of NH-209 from km 123.550 to Km. 150.400 of Dindigul Bangalore Road (Pollachi to Coimbatore Section) | |||
Ennore-Thiruvallur-Bengaluru-Puducherry-Nagapattinam- Madurai-Tuticorin Gas Pipeline | |||
Sakari -Hasanpur (Harnagar - Kusheshwar Asthan) New line | |||
Hajipur-Sagauli New line | |||
Pirpainti Jasidih (97 Km) New BG line | |||
Visakh Refinery Modernisation project | |||
MREP | |||
Penganga OC Mine (4 MTY) | |||
Talaipalli Coal Mining Project (18 MMTPA) | |||
Qadian Beas New Line: 40 Km | |||
Turavur-Ambalapuzha doubling project (50 Km) | |||
Kumbalam-Turavur doubling project (15.59 Km) | |||
Ernakulam-Kumbalam doubling project (7.71 Km) | |||
Tirunavaya-Guruvayur new lin(35 Km) | |||
HVDC Bipole Link between Western Region (Raigarh, Chhattisgarh) and Southern Region (Pugalur, Tamil Nadu) | |||
Khammam - Ashwaraopet Section of NH-365BB | |||
Suryapet - Khammam Section of NH-365BB | |||
Kodad - Khammam Section of NH-365A | |||
Jagtial - Karimnagar - Warangal Section of NH-563 (Package-I, II, III and IV) | |||
Mancherial - Chandrapur Section of NH-363 (Package -I and II) | |||
Hyderabad - Manneguda Section of NH-163 | |||
Sangareddy-Nanded-Akola Section of NH-161 (Package-I, II and III) | |||
India Based Neutrino Observatory (INO) Project | |||
Kovvuru Bhadrachalam Road New Rail Line 151 Km | |||
Mumbai Urban Transport Project (Mutp) Phase II | |||
Neyveli Uttar Pradesh Power Power Project Limited | |||
Manoharabad-Kothapalli New Bg Rail Line: 151 Km Print Project | |||
HPCL Project Extension of VVSPL pipeline from Vijayawada to Dharmapuri | |||
Konaseema Fertilizers and Chemicals Limited | |||
Four Laning of Krishnagar-Baharampore Section of Nh-34: 78 Km | |||
Creation of 400/220 kV Substations and associated Transmission Network under ISTS Strengthening Scheme in National Capital Territory of Delhi. | |||
Comprehensive Scheme for Strengthening of TANDD System in Arunachal Pradesh and Sikkim | |||
Two Lane With Paved Shoulders of Nh-54 In Mizoram: 351 Km | |||
North Karapura Stpp (3X660 Mw) | |||
Barkhera Budni third Railway Line | |||
Deoband-Roorkee New Line Project: 27 Km | |||
Six Laning of Chandikhole-Jagatpur-Bhubaneswar Section On Nh-5: 67 Km | |||
Ghaghara Bridge to Varanasi | |||
Rengali Irrigation Project | |||
New Broad Gauge railway line between Chandigarh (Chandi Mandir, Haryana) and Baddi | |||
Meja STPP (2X660 MW) - JV | |||
Solapur STPP (2X660 MW) | |||
Four laning of Nagina-Kashipur section of National Highway - 74 in Uttarakhand and Uttar Pradesh | |||
Kullu Manali section | |||
Takoli to Kullu | |||
200 MW Solar Park Project in Kasargod States/UTs | |||
MDPL Capacity Expansion and Palanpur Vadodara Pipeline Extension | |||
Wardha-Nanded New Line | |||
Angamali-Sabarimala New Line | |||
Rayadurg-Tumkur via Kalyandurg New Line | |||
Tarakeshwar-Bishnupur New Line (82.47 km) | |||
Tindivanam-Nagari (184.99 km) New Line | |||
Dahod-Indore via Sardarpur, Jabuwa and Dhar (204.76 km) NL | |||
Villupuram-Dindigul Doubling with Electrification (273 km) | |||
Ratlam-Mhow-Khandwa-Akola Gauge Conversion | |||
Kadapa-Bangalore New Line | |||
Gadag-Wadi New Line (252 km) | |||
Belapur-Seawood-Uran Electrified Double Line, Mumbai | |||
Tumkur-Chitradurga-Davangere New Rail Line Project (200 Km.) | |||
Char Dham Road Connectivity Improvement (889 Km.) | |||
Two Lane Road From Singtam-Kewzing : Nh-510 (44 Km) | |||
Nangal Dam-Talwara New Broad Gauge Line (84 Km) and Taking Over Siding Mukerian-Talwara (29 Km) | |||
Tetlia-Byrnihat New Line | |||
Two laning with paved shoulder of Karauli - Dholpur Section in the State of Rajasthan | |||
Jammu-Udhampur-Srinagar-Baramulla Rail Link Project | |||
Ph II extension of MRTS from Velachery to St Thomas Mount | |||
Madurai- Tuticorin New Line | |||
Eastern Dedicated Freight Corridor | |||
Western Dedicated Freight Corridor | |||
Ahmednagar Beed Parli Vaijnath New B.G. Line Railway Project | |||
Khurda Bolangir New Bg Rail Link (289Km) | |||
Hospet- Tinaighat-Vasco Rail Doubling Project | |||
Kirandul-Jagdalpur Doubling (150 km) | |||
Tapovan-Vishnugad HEP (4x130 MW) | |||
Lata-Tapovan Hydero Electric Power Project (3x57 MW) | |||
LARA Super Thermal Power Project Stage-I (2x800 MW) | |||
Tanda TPP Stage-II (2x660 MW) | |||
Darlipalli Stpp Stage-I (2X800 Mw) | |||
Munirabad Mahabubnagar New Railway Line | |||
Eastern Region Strengthening Scheme-V | |||
Pakal Dul (Drangdhuran) Hydroelectric Project, 1000 MW | |||
Different Coal Projects, Existing Mines located in WB | |||
Dhupguri to Salsabari section of NH-31D, Package-II | |||
Ghospukur to Dhupguri section of NH-31D, package-I | |||
Sambalpur-Titlagarh Doubling | |||
Rehabilitation and up gradation to two lane with paved shoulders from 33.5 to 254 of NH-214A(new no-216) in Krishna, Guntur and prakasham States/UTss of Andhra Pradesh | |||
4-Laning of Varanasi Gorakhpur (Mao-Gorakhpur Section) of NH-29 | |||
Southern Region Strenthening Scheme - XIII and XIV | |||
Kundankulam APP Transmission System | |||
Jatinga Junction to Harangajao section | |||
Rehabilitation and upgradation of NH-565 from km.1/0 to 86/057 (Nakrekal to Nagarjunsagar Dam Section) to two-lanes with paved shoulders under NHDP-IV on EPC | |||
Jiribam-Imphal New Line | |||
Dallirajahara-Jagdalpur New Line | |||
Nadikudi-Srikalahasti New Line | |||
Irugur Devangonthi Product Pipeline | |||
BPCL LPG Pipeline from Kochi to Erode and Salem via Coimbatore | |||
Coal Coal Projects (Future) of ECL in Jharkhand | |||
Coal mining Projects of SECL in State of Madhya Pradesh | |||
Coal mining Projects of SECL in State of Chhattisgarh | |||
Coal mining projects of CCL in Jharkhand | |||
Coal Projects of SCCL in Telangana State | |||
Coal Mining Projects of Mahanadi Coalfields Limited in Odisha | |||
Coal projects of WCL in Madhya Pradesh state | |||
Raniganj Master Plan | |||
Four laning of Patna-Gaya-Dobhi Section from Km. 0.000 to Km.127.358 of NH-83 in the State of Bihar under NHPD Phase-III | |||
New Railway Line between Ginigera and Raichur | |||
NMDC Iron Ore Beneficiation Plant at Bacheli | |||
NMDC Iron and Steel Plant, Nagarnar | |||
GAIL Project- KKBMPL | |||
To augment the iron ore production capacity of Gua Iron Ore Mine of SAIL from 2.4 MT to 10 MT including installation of Beneficiation and Pellet Plant facilities at Gua, Jharkhand. | |||
Hubli-Ankola new line project | |||
Byrnihat-Shillong new line project | |||
Sivok-Rangpo new line Project | |||
Kitcha-Khatima new line Project | |||
Dedicated freight link from Wadala to Kurla-Rail Connectivity Project for Mumbai Port | |||
Kerandari Coal Block | |||
HPCL Project - Uran-Chakan/Shikrapur LPG Pipeline | |||
GAIL Project - Jagdishpur - Haldia Pipeline | |||
IOCL Project-Cauvery Basin Refinery (CBR)-Trichy Pipeline | |||
Haridaspur-Paradeep new railway line | |||
Talcher-Bimlagarh new railway line | |||
Angul-Sukhinda new line project | |||
Subansiri Lower HE Project | |||
Bhanupalli-Bilaspur-Beri new railway line project | |||
Shivpur -Kathautia New BG Rail Line |