Status of Central Sector Projects Showing Time and Cost Overruns in India (As on 01.03.2016) | ||||||||||
Projects | Sectors | Implementing Agency | Date of Approval (Month/Year) | Original Date of Commissioning (Month/Year) | Anticipated Date of Commissioning (Month/Year) | Cost Original (Rs. in Crore) | Cost Anticipated (Rs. in Crore) | Cumulative Expenditure (Rs. in Crore) | Cost Overrun^ (%) | Time Overrun $ (Months) |
Prototype Fast Breeder Reactor (Bhavini, 500 Mwe) | ||||||||||
Kudankulam App (Npcil) | ||||||||||
Nigahi Oc Expansion Project 10 Mty to 15 Mty, Singrauli | ||||||||||
Adriyala Shaft Project | ||||||||||
Ramagundam Oc-Ii Extension | ||||||||||
Rfr of Manuguru Oc Project | ||||||||||
National Automotive Testing and Rd Infrastructure Project (Natrip) | ||||||||||
Uran Chakan/Shikrapur Lpg Pipeline | ||||||||||
Mangalore Hassan Mysore Solur Lpg Pipeline (Mhmslpl) | ||||||||||
50 Mw Capacity Wind Power Project Under Phase Ii | ||||||||||
Lpg Terminal at Kochi | ||||||||||
Paradip Refinery Project | ||||||||||
Strategic Crude Oil Storage Project at Padur | ||||||||||
Strategic Crude Oil Storage Project at Mangalore | ||||||||||
Upgradation of Crude Oil Pump Stations of Naharkatiya-Barauni Crude Oil Trunk Pipeline | ||||||||||
Secondary Tank Farm With Dehydration Facility and Effluent Treatment Plant at Madhuban | ||||||||||
Conversion of Rig Sagar Samrat to Mobile Offshore Production Unit(Mops) | ||||||||||
Integrated Development of B-127 Fields | ||||||||||
Raghunathpur Thermal Power Station Phase-I | ||||||||||
Bokaro Thermal Power Station-A | ||||||||||
Tuirial Hydro Electric Project (60Mw) | ||||||||||
Kameng Hydroelectric Project (Neepco) | ||||||||||
Pare Hydro Electric Project | ||||||||||
Parbati Hep (4X200 Mw) (Nhpc) Ii | ||||||||||
Teesta Low Dam Hep, Stage-Iv (4X40 Mw) (Nhpc) | ||||||||||
Kishanganga Hep (3X110 Mw) | ||||||||||
Barh Stpp(3X660Mw) Ntpc | ||||||||||
Bongaigaon Thermal Power Project | ||||||||||
Tapovan-Vishnugad Hep (4X130Mw) | ||||||||||
Western Region Strengthening Scheme-V | ||||||||||
Transmission System Associated With Pallatana Gbpp and Bpts. | ||||||||||
System Strengthening In North/West Part of Wr For Ipp Projects In Chattisgarh | ||||||||||
North- East North Western Interconnector I Project | ||||||||||
Kunadankulam App Trans System (Pgcil) | ||||||||||
Sytem Strengthening of Southern Region - Xiv | ||||||||||
Transmission System For Connectivity of Essar Power Gujarat Limited | ||||||||||
Tehri Pumped Storage Plant(1000Mw) | ||||||||||
Rail-Cum-Road Bridge at Munger (Nl), Ecr# | ||||||||||
Belapur-Seawood-Uran Electrified Double Line(Mtp) | ||||||||||
Mumbai Urban Transport Project Phase-Ii | ||||||||||
Multi Modal Transport System(Mmts) Phase-Ii Hyderabad | ||||||||||
Jiribam to Imphal (Tupui)(Nl)(Nefr) | ||||||||||
Bhairabi Sairong, Nl, Nefr | ||||||||||
Agartala Sabroom, Nl, Nefr | ||||||||||
Katihar - Jogbani (Gc)(Nefr) | ||||||||||
New Line From Dimapur to Zubza(Kohima) National Project (Nefr) | ||||||||||
New Maynaguri to Jogighopa Via Changrabandha (Nl),Nefr | ||||||||||
Bputra Bridge at Bogibil and Link Lines Nefr# | ||||||||||
Lumding-Silchar Jiribam, Badarpur-Baraigram Kumarghat National Project# | ||||||||||
Sevok Rangpo, Nefr | ||||||||||
Katakhal to Bhairabi | ||||||||||
Construction of Nl From Kumarghat-Agartala# | ||||||||||
Udhampur-Srinagar-Baramulla (Nl),Nr# | ||||||||||
Utratia-Zafrabad, Nr (Line Doubling)# | ||||||||||
Electrification of Khurja-Meerut-Saharanpur and G`Bad-Meerut | ||||||||||
Khurda Road - Barang 3Rd Line (Dl) (Ecor) | ||||||||||
Rajatgarh-Barang(Ld),Ecor | ||||||||||
Bhopal Bina 3D Line Doubling | ||||||||||
Salka Road -Anupnagar Line Doubling | ||||||||||
Gondia-Jabalpur(Gc),(Secr)# | ||||||||||
Bankura - Damodar (Gc) (Ser) | ||||||||||
Tamluk Digha,Line Doubling (Ser) | ||||||||||
Dangoaposi-Rajkharswan 3Rd Line Doubling | ||||||||||
Champajharan-Bimalgarh Doubling Extension | ||||||||||
Panipat-Jalandhar 6 Lane(Km 96 to 387.1 Km) | ||||||||||
Maibang to Lumding (As-25), Km.83.400 to Km.111.000 | ||||||||||
Maibang to Lumding (As-24), Km.111.000 to Km.126.450 | ||||||||||
Harangajo to Maibang, Nh-54 | ||||||||||
Brahmputra Bridge,Nh No-31 | ||||||||||
Ganga Bridge to Ramdevi Crossing Ph.Ii Nh-25, Km.75-80.06 | ||||||||||
Harangajo to Maibang (As-23), Km.126.450 to Km.140.700 | ||||||||||
Chambal Bridge, Nh-76 (Rj-5) | ||||||||||
Ennore Manali Express Way,F/O Special Purpose Vehicle (Spv) | ||||||||||
Rail Connectivity to Ictt at Vallarpadam at Cochin Port Trust | ||||||||||
Construction of Medical College and Hospital at Gulbarga | ||||||||||
Construction and Mainteinance of Rural Road Under Pmgsy Phase Viii | ||||||||||
Construction and Mainteinance of Rural Road Under Pmgsy Phase V | ||||||||||
Revamping of Sinter Machines - 1 and 2 |