Sector/Category-wise Energy Plant Load Factor in India (September, 2023) | |||||
Sectors/Categories | Monitored Capacity (In MW) | Generation Target (2023-2024) (In GWh) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Month (2022-2023) | |||
Central Sector | |||||
Thermal | |||||
Nuclear | |||||
Hydro | |||||
Total | |||||
State Sector | |||||
Thermal | |||||
Hydro | |||||
Total | |||||
Private Sector Utilities | |||||
Thermal | |||||
Hydro | |||||
Total | |||||
Private Sector IPP | |||||
Thermal | |||||
Hydro | |||||
Total | |||||
Total Private | |||||
Bhutan Imp. |