Sector/Category-wise Energy Plant Load Factor in India (2024-2025-upto April 2024) | |||||
Sectors/Categories | Monitored Capacity (In Megawatt) | Generation Target (2024-2025) (In Gigawatt Hours) | Plant Load Factor (In %age) | ||
Program | Actual1 | Actual Same Period (2023-2024) | |||
Central Sector | |||||
Thermal | |||||
Nuclear | |||||
Hydro | |||||
Total | |||||
State Sector | |||||
Thermal | |||||
Hydro | |||||
Total | |||||
Private Sector Utilities | |||||
Thermal | |||||
Hydro | |||||
Total | |||||
Private Sector Independent Power Producer (IPP) | |||||
Thermal | |||||
Hydro | |||||
Total | |||||
Total Private | |||||
Bhutan Import |