Station/Agency-wise Gas Requirement forĀ Gas Based Power Projects in India (2007-2012) | ||||
Power Station/Agency | Total Capacity (MW) | Capacity Likely in 11th Plan (MW) | Located in State | Gas Requirement for Likely Capacity in 11th Plan at 70/75% PLF (MMSCMD) |
Bawana CCGT by PPCL (State Sector) | ||||
Hazira CCP/ M/s Gujarat State Energy Generation Limited (GSEG) (State Sector) | ||||
Pipavav CCPP, Ph-I/ M/s GSPC Pipavav Power Company Limited (State Sector) | ||||
Kashmir CCGT by Sravanthi Energy Pvt. Ltd.. Ph-I and II (Private Sector) | ||||
Lanco Kondapalli Exp Stage-III (Private Sector) | ||||
Vemagiri CCPP Exp of GMR (Private Sector) | ||||
Sugen Phase-I Unit -4 M/s Torrent (Private Sector) | ||||
Dahej SEZ (Torrent) (Private Sector) | ||||
Samalkot Expansion (Private Sector) | ||||
CCGT by M/s Panduranga Energy Systems Pvt. Ltd (PSPL)-Ph-I (Private Sector) | ||||
RVK (Rajahmundry) Private Ltd.* (Private Sector) | ||||
CCGT by M/s Beta Infratech Private Ltd (Private Sector) | ||||
CCGT by M/s Gama Infratech Pvt. Ltd (Private Sector) | ||||
Total |