Station/State-wise Allocation of Power from Central Generating Stations (CGSs) in Eastern Region of India - Part I (As on 31.03.2016) | ||||||||||
Stations | Installed Capacity (In MW) | Allocated Capacity# (In MW) | Bihar | Jharkhand | D.V.C. | Odisha | ||||
(In %age) | (In MW) | (In %age) | (In MW) | (In %age) | (In MW) | (In %age) | (In MW) | |||
A. Firm Share | ||||||||||
NTPC Stations | ||||||||||
Barh STPS Stage-II (U# 4) | ||||||||||
Farakka (U# 1 to 5) | ||||||||||
Farakka (U# 6) | ||||||||||
Kahalgaon | ||||||||||
Kahalgaon-II (3 units) | ||||||||||
Talcher | ||||||||||
Talcher Stage-II | ||||||||||
NHPC Stations | ||||||||||
Rangit HPS | ||||||||||
Teesta-V HPS (3 units) | ||||||||||
Bhutan Stations | ||||||||||
Tala HPS (Bhutan) * | ||||||||||
Chukha HPS (270MW out of 336 MW Allocated to India) | ||||||||||
Kurichu HPS | ||||||||||
Sub-Total (A) | ||||||||||
B. Dedicated Stations | ||||||||||
Muzaffurpur TPS U# 1 & 2 | ||||||||||
Talcher TPS | ||||||||||
DVC** | ||||||||||
Teesta Low Dam | ||||||||||
Sub-Total (B) | ||||||||||
C. Firm Power from/to Other Regions | ||||||||||
C1. DVC`s Surrendered Share## | ||||||||||
C2. Merchant Power of Korba U# 7 | ||||||||||
C3. Merchant Power of Farakka U# 6 | ||||||||||
C4. Allocation to NR in Lieu of Tala power | ||||||||||
(i) Farakka (Unit 1 to 5) | ||||||||||
(ii) Kahalgaon | ||||||||||
(iii) Kahalgaon-II (3 units) | ||||||||||
(iv) DVC Mejia U#6 (150 MW) | ||||||||||
(v) Unallocated Power of Tala (15% of 1020 MW)* | ||||||||||
Sub-Total (C) | ||||||||||
D. Total Firm Power [=A+B+C] | ||||||||||
E. Unallocated Power of ER CGSs | ||||||||||
E1. Unallocated Power of NHPC Stations+ | ||||||||||
E2. Unallocated Power of Bhutan HPSs+ | ||||||||||
E3. Unallocated Power of NTPC Stations | ||||||||||
E3.1. Specific Allocation from E3 above | ||||||||||
(i) Bundling with Dadri Solar Power | ||||||||||
(ii) Bundling with JNNSM Solar Power | ||||||||||
E3.2. Balance Unallocated Share of NTPC Stations [=E3-E3.1] | ||||||||||
(i) Barh STPS Stage-II (U# 4) | ||||||||||
(ii) Farakka (U# 1 to 5) | ||||||||||
(iii) Farakka (U# 6) | ||||||||||
(iv) Kahalgaon | ||||||||||
(v) Kahalgaon-II (3 units) | ||||||||||
(vi) Talcher | ||||||||||
Sub-Total (E3) [=E3.1+E3.2] | ||||||||||
Sub-Total (E) [=E1+E2+E3] | ||||||||||
F. Total Allocation to ER Beneficiaries [=D+E] | ||||||||||
G. Commissioned but Non-CoD units | ||||||||||
1. Muzaffpur TPS U# 3 | ||||||||||
2. Barh-II U# 5 | ||||||||||
3. Raghunathpur, Ph-I, U# 1 | ||||||||||
4. Teesta Low Dam U#2, Stg. IV (40 MW) | ||||||||||
5. Bokaro-A (DVC Project) 1x500 MW | ||||||||||
6. Nabinagar TPP, Unit#1, 250MW | ||||||||||
H. Total Power [=F+G] |