Station/State-wise Allocation of Power from Central Generating Stations (CGSs) in Northern Region of India - Part I (As on 31.03.2018) | ||||||||||||
Stations | Installed Capacity (In MW) | Allocated Capacity (In MW) | Within the Region | |||||||||
Chandigarh | Delhi | Haryana | Himachal Pradesh | Jammu and Kashmir | ||||||||
(%age) | (In MW) | (%age) | (In MW) | (%age) | (In MW) | (%age) | (In MW) | (%age) | (In MW) | |||
(A) Firm Share | ||||||||||||
(A1) NR CGSs | ||||||||||||
Singrauli STPS | ||||||||||||
Rihand STPS | ||||||||||||
Rihand STPS Stg. | ||||||||||||
Rihand STPS Stg. ( Unit 5 and 6) | ||||||||||||
I TPS | ||||||||||||
II TPS | ||||||||||||
Unchahar-III TPS (Unit 5) | ||||||||||||
Unchahar-IV TPS (Unit 1) | ||||||||||||
Dadri NCTPS | ||||||||||||
Dadri NCTPS | ||||||||||||
Dadri NCGPS | ||||||||||||
Anta GPS | ||||||||||||
Auraiya GPS | ||||||||||||
Indira Gandhi STPS (Jhajjar) (Unit 1, 2 & 3) | ||||||||||||
Narora Atomic Power Station (NAPS) | ||||||||||||
Rajasthan Atomic Power Plant (RAPP U-5 & 6) | ||||||||||||
Salal HPS | ||||||||||||
Chamera HPS- I | ||||||||||||
Chamera HPS- II | ||||||||||||
Chamera HPS- III | ||||||||||||
Tanakpur HPS | ||||||||||||
Bairasiul HPS | ||||||||||||
Uri-I HPS | ||||||||||||
Uri-II HPS (Unit 1, 2, 3 & 4) | ||||||||||||
Dhauliganga HEP | ||||||||||||
Nathpa Jhakri HPS | ||||||||||||
Dulhasti HEP | ||||||||||||
Tehri Stage-I (4 Units) | ||||||||||||
Sewa - II HEP (3) | ||||||||||||
Koteshwar HEPS (Unit 1, 2, 3 & 4) | ||||||||||||
Parbati-III HEP (Unit-1, 2, 3, 4) | ||||||||||||
Rampur HEP (Unit#1, 2, 3, 4, 5, 6) | ||||||||||||
Koldam HEP (800(In MW)) | ||||||||||||
Singrauli Small Hydro Power Project (2*4 (In MW)) | ||||||||||||
Sub-Total A1 | ||||||||||||
(NR CGSs) | ||||||||||||
CGSs of Other Regions | ||||||||||||
Farakka STPS (1600 (In MW)) | ||||||||||||
Kahalgaon - I (840(In MW)) | ||||||||||||
Mezia unit 6 (250 (In MW)) | ||||||||||||
Kahalgaon -II (1500(In MW)) [498 (In MW) firm+ 343 (In MW) in lieu of Tala] | ||||||||||||
Sub-Total A2- (CGSs Other Regions) | ||||||||||||
Sub-Total (A) | ||||||||||||
(B) Non Firm-Allocation | ||||||||||||
Rajasthan Atomic Power Station U-3&4 | ||||||||||||
(C) Dedicated Station | ||||||||||||
Badarpur TPS | ||||||||||||
Tanda TPS | ||||||||||||
Faridabad CCGT | ||||||||||||
Rajasthan Atomic Power Station U-3&4 (RAPS U-1 & 2) | ||||||||||||
Chutak(H) 4*11 | ||||||||||||
Barsingsar Lignite(T) 2*125 | ||||||||||||
Sub-Total (C) | ||||||||||||
Total Allocation (A+B+C) | ||||||||||||
(E) Total Unallocated Power Of Nr Cgss Excluding Raps 3 & 4 | ||||||||||||
(E1) Specific Allocation to Other Regions/Countries from E Above | ||||||||||||
(E2) Balance Unallocated Power of NR CGSs Excluding RAPs 3 & 4 [E-E1] | ||||||||||||
(E2.1) Allocations from E2 above | ||||||||||||
To Power Grid (HVDC)$ | ||||||||||||
To Railways $$ | ||||||||||||
To Jammu and Kashmir | ||||||||||||
For Bundling with Solar Power (under JNNSM)% | ||||||||||||
To UP (Due to Drought) | ||||||||||||
Sub-Total (E2.1) | ||||||||||||
(E2.2) Balance Unallocated Power of NR CGSs in the Pool Excluding RAPS 3&4 [= E2 - E2.1] | ||||||||||||
(F) Unallocated Power RAPS 3 & 4 (440-374) | ||||||||||||
(G) Unallocated Power of Tala HEP (Bhutan) | ||||||||||||
(H) Unallocated Power from WR | ||||||||||||
(I) Total Unallocated in NR [= E2.1+E2.2+F+G+H] | ||||||||||||
(J) Net Power of NR Excluding Bangladesh BPDB Power [=D+I] | ||||||||||||
(K) Commissioned But Non-CoD Units | ||||||||||||
Nimmo Bazgo Unit 2 | ||||||||||||
Nimmo Bazgo Unit 3 | ||||||||||||
Nimmo Bazgo Unit 1 | ||||||||||||
Unchhar-III TPS | ||||||||||||
(L) Total Power = [J+K] |