Station-wise Cost of Generation (Tariff) of Thermal Generating Stations (NTPC, NLC and NEEPCO) in India (As on 31.05.2009) | ||||
(In Paise/kWh Ex-bus) | ||||
Generating Station | Installed Capacity (As on 31.05.2009) | 2008-09 | ||
Fixed Charges | Energy Charges as in May, 2009 | Total | ||
Coal Based Thermal Generating Stations of NTPC | ||||
Pit Head Generating Stations | ||||
Rihand STPS st-I | ||||
Rihand STPS st-II | ||||
Singrauli STPS | ||||
Vindhyachal STPS st-I | ||||
Vindhyachal STPS st-II | ||||
Vindhyachal STPS st-III | ||||
Korba STPS | ||||
Ramagundam STPS st-I & II | ||||
Ramagundam STPS st-III | ||||
Talcher TPS | ||||
Talcher STPS st-I | ||||
Talcher STPS st-II | ||||
Sipat-II | ||||
Sub-Total | ||||
Non-Pit Head Generating Stations | ||||
GFGUTPP TPS st-I | ||||
GFGUTPP TPS st-II | ||||
GFGUTPP TPS st-III | ||||
NCTP Dadri | ||||
Farrakka STPS | ||||
Tanda TPS | ||||
Badarpur TPS | ||||
Kahalgaon STPS st-I | ||||
Kahalgaon STPS st-III | ||||
Simhadri | ||||
Sub-Total | ||||
Total Coal | ||||
Lignite Based Thermal Generating Stations of NLC | ||||
TPS-I | ||||
TPS-II Stage-I | ||||
TPS-II Stage-II | ||||
TPS-I (Expansion) | ||||
Total Lignite | ||||
Gas/Liquid Fuel Based Stations of NTPC | ||||
Using Natural Gas as Fuel | ||||
Dadri CCGT | ||||
Faridabad | ||||
Anta CCGT | ||||
Auraiya GPS | ||||
Gandhar GPS | ||||
Kawas GPS | ||||
Total | ||||
Using Liquid Fuel (Naphtha/HSD) as Fuel | ||||
Dadri CCGT | ||||
Faridabad | ||||
Anta CCGT | ||||
Auraiya GPS | ||||
Kayamkulam CCGT | ||||
Kawas GPS | ||||
Total | ||||
Gas/Liquid Fuel Based Stations of NEEPCO | ||||
Agartala GPS | ||||
Assam GPS | ||||
Total |