Station-wise Energy Plant Load Factor by Type of Fuel (Coal/Lignite) in India (January, 2024) | |||||
Stations | Monitored Capacity (In Megawatt) | Generation Target (2023-2024) (In Gigawatt Hour) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Month (2022-2023) | |||
I. Fuel-wise Break up-Coal Based | |||||
Total Central | |||||
Total Private | |||||
Total Private Independent Power Producer (IPP) | |||||
Total State | |||||
Total Coal Based | |||||
II. Fuel-wise Break up-Lignite Based | |||||
Barsingsar Lignite | |||||
Giral Thermal Power Stations (TPS) | |||||
Jalipa Kapurdi Thermal Power Plant (TPP) | |||||
Akrimota Lignite Thermal Power Stations (TPS) | |||||
Bhavnagar Circulating Fluidized Bed Combustion (CFBC) Thermal Power Plant (TPP) | |||||
Kutch Lignite Thermal Power Stations (TPS) | |||||
Surat Lignite Thermal Power Stations (TPS) | |||||
Neyveli (Extension) Thermal Power Stations (TPS) | |||||
Neyveli New Thermal Power Plant (TPP) | |||||
Neyveli Thermal Power Stations (TPS)-II | |||||
Neyveli Thermal Power Stations (TPS)-II Expansion | |||||
Neyveli Thermal Power Stations (TPS) (Z) | |||||
Total Lignite Based |