Overall Safety Performance and Investment of Railway Services in India (2004-2005 to 2013- 2014 and 2014-2015 to 2022-2023) | ||||||
Items | Unit | 2004-2005 to 2013-2014 | 2014-2015 to 2022-2023 | Comparison of the Period 2014-2023 with the Period 2004-2014 | ||
Cumulative for 10 Years | Average Per Year | Cumulative for 9 Years | Average Per Year | |||
A. Track Maintenance | ||||||
Expenditure on Track Renewal | ||||||
Rail Renewal Primary | ||||||
Use of High Quality Rails (60 Kg) | ||||||
Longer Rail Panels (260M) | ||||||
Usfd (Ultra Sonic Flaw Detection) Testing of Rails | ||||||
Usfd (Ultra Sonic Flaw Detection) Testing of Welds | ||||||
Track Km Added | ||||||
Weld Failures | ||||||
Rail Fractures | ||||||
Thick Web Switches | ||||||
Track Machines | ||||||
B. Level Crossing Gate Elimination | ||||||
Elimination of Unmanned Level Crossing Gates | ||||||
Elimination of Manned Level Crossing Gates | ||||||
Construction of Road Over Bridges (I.E. Flyovers)/ Road Under Bridges ( I.E. Underpasses) | ||||||
Expenditure on LC Elimination | ||||||
C. Bridge Rehabilitation | ||||||
Expenditure on Bridge Rehabilitation | ||||||
D. Signalling Works | ||||||
Electronic Interlocking | ||||||
Automatic Block Signaling | ||||||
Fog Pass Safety Devices | ||||||
E. Rolling Stock | ||||||
Manufacture of LHB Coaches | ||||||
Provision of Fire and Smoke Detection System in Coaches | ||||||
Provision of Fire Detection and Suppression System in Pantry and Power Cars | ||||||
Provision of Fire Extinguishers In Non –Ac Coaches | ||||||
F. Gross Budgetary Support For Railway Investment (GBS 2023-2024 : Rs 2.4 Lakhs Crore) | ||||||
G. Expenditure on Safety Related Works |