Project-wise Approved Cost and Funds Released under Non-Lapsable Central Pool of Resources (NLCPR) Scheme in Assam (2012-2013 to 2014-2015) | |||
(Rs. in Lakh) | |||
NLCPR Project | Approved Cost | Funds Released | Status (Ongoing/ Completed) |
2012-13 | |||
Khowra flow Irrigation Scheme | |||
Rajendrapur Flow Irrigation Scheme | |||
Conversion of Washed out STP Bridge No. 2/1 over River Hell into RCC Bridge on Shialmari Moinaguri Road in Kokrajhar State | |||
Construction of Road from Gopalpur (Kekerikuchi) to Niz-Kaurbaha (13.50km Length) Including Construction of RCC Br.No5/1 (15.00m) under PWD, Musalpur (R and B) Division. | |||
2013-14 | |||
College of Nursing at Kokrajhar | |||
Construction of Road from Paoriputa to Natun Panbari with Black Topping and Construction of RCC Bridge over River Pasnai in Udalguri Rural Road Division (Length - 2.30 Km) in Assam | |||
Improvement of Road from Budura to Parbhuchuba Dimakuchi PWD Road at Batabari via Khasiachuba, Barangabari | |||
Improvement of Banglagarh Jaberikuchi Road Including Cross Drainage works in Darrang State | |||
Const of RCC Br. No.9/8 over Laska on Dauluguri Dotma Road | |||
Conversion of SPT Bridge No. 10/1, 12/3, 14/2 and 16/1 into RCC Bridge on Metd. Kokrajhar Bahalpur Road | |||
Improvement of Road from Khairabari to Jamuguri in Udalguri | |||
Improvement of Road from Barama- Dhamdhama -Tamulpur under Non Lapsable Central Pool of Resources. | |||
2014-15 | |||
Construction of Road from Borobazar to Gumergaon via Chawdhuripara in Chirang State | |||
Improvement of Kharupetia Udalguri Road from Ch. 0.00 km to 15.00km (EW GSB BM and SDBC Pavement Length 15.00 km Carriage way Width 5.50m) Including RCC Drains in the Bazar Portion under Darrang State. | |||
Construction of Road from Bijni Subhaijhar Road at Village Nayapara No.2 to Kathalguri via Sanyasiguri Including Construction of RCC Bridge No.1/2 over River Chara in Chirang State. | |||
Total |