Amount Sanctioned for Pollution Abatement Scheme for River at Pamba and Sabarimala under National River Conservation Plan in India (May, 2003) | |
(Rs. in Lakh) | |
Items | Amount |
Establishment of 3 MLD Sewage Treatment Plant As Sabrimala | |
Establishment of 1.5 MLD Sewage Treatment Plant At Pamba of Technical Report | |
Sewage Collection Tank Pumping System and Sewer Lines in Sabrimala and Pamba | |
Construction of 300 Latrines at Pamba and 400 Latrines 100 Bathrooms at Sabrimala | |
Solid Waste Collection and Disposal Arrangements in Sabrimala and Pamba | |
Segregation of Existing Drains and Construction of New Drains at Sabrimala and Pamba | |
Construction of Mobile Latrines at Sabrimala and Pamba | |
Interception Barriers of Sewage Across Kakka Thodu and Urakkuzhi Theertham in Pamba | |
Construction of Storage Weirs and Allied Works for Flushing The Pollutants One Each in Pamba River and Kakki River Upstream of The Confluence Point in Pamba With Fencing at Pollutant Sources and Storage Shed for Generator Near Weir | |
Construction of Weir Downstream of Bathing Ghat at Arattukadavu to Prevent Pollutants of Njunajar River Entering The Bathing Ghat at Pamba | |
New Bathing Ghat and Allied Works on The Left Side of Pamba River Opposite to The Existing Bathing Ghat | |
Public Awareness | |
Sub-Total | |
Add 15 Percent Escalation | |
Total | |
Add 8 Percent Centage Charges | |
Grand Total |