Station-wise Installed Capacity and Actual Generation of Hydro Electric Stations (Installed Capacity Above 25 MW) in Himachal Pradesh (2016-2017 to 2019-2020-upto 30.05.2019) | |||||
Station/Utility | Installed Capacity (In Mega Watt) As on 30.05.2019 | Generation (In Million Unit) | |||
2016-2017 | 2017-2018 | 2018-2019 | 2019-2020* | ||
Bhakra Beas Management Board (BBMB) | |||||
Bhakra L and R | |||||
Dehar | |||||
Pong | |||||
Total | |||||
National Hydroelectric Power Corporation (NHPC) | |||||
Baira Siul | |||||
Chamera-I | |||||
Chamera-II | |||||
Chamera-III | |||||
Parbati III | |||||
Parbati II | |||||
Total | |||||
Satluj Jal Vidyut Nigam Limited (SJVN) | |||||
Naptha Jhakri | |||||
Rampur | |||||
TotalĀ | |||||
National Thermal Power Corporation Limited (NTPC) | |||||
Kol Dam | |||||
Total | |||||
Himachal Pradesh Power Corporation Limited (HPPCL) | |||||
Kashang I | |||||
Kashang II and III | |||||
Sainj | |||||
Total | |||||
Himachal Pradesh State Electricity Board Ltd. (HPSEB) | |||||
Bassi | |||||
Giri Bata | |||||
Larji | |||||
Sanjay | |||||
Total | |||||
Punjab State Power Corporation Limited (PSPCL) | |||||
Shanan | |||||
Total | |||||
Allain Duhangan Power Power Ltd. (ADPP) | |||||
Allain Duhangan | |||||
Everest Power Private Ltd. | |||||
Malana-II | |||||
Himachal Baspa Power Company Limited (HBPCL) | |||||
Baspa-II | |||||
Karcham Wangtoo | |||||
Total | |||||
Greenko Budhil Hydro Power Private Limited (GBHPPL) | |||||
Budhil | |||||
IA Energy Pvt. Ltd. | |||||
Chanju I | |||||
Malana Power Company Ltd. | |||||
Malana | |||||
Total - Himachal Pradesh | |||||
India |