Length of Power Transmission Lines Completed by Sector in India (As on 31.03.2023) | ||||
Transmission Lines/Sector | Circuit Type | Executing Agency | Month of Completion | Line Length (In cKM) |
765 kV | ||||
Central Sector | ||||
Reconfiguration of BhujPS- Lakadia PS as to establish Bhuj-II-Lakadia line as well as Bhuj-II-Bhuj-II line | ||||
Lakadia PS -Bhuj II line (A portion of Reconfiguration of Bhuj PS - Lakadia PS Bhuj-II-Lakadia (Bhuj-Bhuj II) (Loop out portion ) | ||||
LILO of 765kV Gr. Noida (765kV)- Hapur(765) line at Meerut | ||||
Total | ||||
Private Sector | ||||
Dharamjaygarh Pool section B - Raigarh (Tamnar) Pool line (G-TTPL-TBCB) | ||||
Lakadia PS - Banaskantha PS | ||||
Bhuj PS - Lakadia PS | ||||
Lakadia - Vadodara Transmission line | ||||
Total | ||||
Total of 765 KV | ||||
400 kV | ||||
Central Sector | ||||
LILO of Kishanganj (POWERGRID) - Darbhanga (DMTCL) (QUAD) line at Saharsa (New) | ||||
Rampur -Sambhal line | ||||
Re-conductoring of Maithon RB - Maithon line | ||||
Jeerat (New) - Subhasgram (PM-JTL-TBCB) | ||||
Bina - Guna line | ||||
Diversion of Dhauliganga - Bareilly 400 kV D/C line (operated at 220kV) at Bareilly end from Bareilly (UP) to Bareilly (PG) line (one ckt charged) | ||||
LILO of both ckt.of 400 kV D/C Dhauliganga - Bareilly (PG) line at Jauljivi ( 2 Ckts charged) | ||||
Diversion of Dhauliganga -Bareilly 400kV D/C (operated at 220kV) at Bareilly end from Bareilly to Bareilly (PG) line (balance one Ckt Charged) | ||||
LILO of both Ckt. of 400kV D/C Dhauliganga -Bareilly (PG) line at Jaulijvi (Balance 2 Ckts Charged) | ||||
Re-conductring of the NP Kunta-Kolar (Twin Moose) section with high capacity conductors (like twin HTLS equivalent or QM) | ||||
NTPC Limited -Bhadla-II (On D/C Tower) | ||||
NTPC ltd 300MW Power Plant -Common (PS) of NTPCs 250MW and 300MW Solar Project | ||||
Lower Subhansiri - Biswanath Chariyali line -I | ||||
LILO of 400kV Bareilly (PGCIL) - Moradabad line (Ckt-1) at Rampur s/s (under Mohanlalgani Intrastate Project ) | ||||
Mohindergarh - Bhiwani line | ||||
Reconducting of Kolhapur (PG)- Kolhapur (MSETCL) (Ckt-1) under TS Strengthening beyond Kolhapur for export of power from Solar and Wind Energy Zones in Southern Region | ||||
Simbhavali -Meerut line | ||||
Total | ||||
State Sector | ||||
LILO of Nabinagar -II - Patna (PG) at Jakkanpur (New) | ||||
Indore (PGCIL) - Ujjian (GEC-I) | ||||
Badaun-Sambhal Line | ||||
Gokarna - New Chanditala | ||||
Hadala-Shapar line with (Twin AL-59) conductor | ||||
Ashta (400kV)- Ujjain (400kV) line | ||||
LILO of Karad - Lonikand at Jejuri | ||||
Varanasi (PG)-Jaunpur Line | ||||
LILO of one ckt of Khandwa (PGCIL) - Rajgarh (PGCIL) at Chhegaon | ||||
Yadadri TPP switchyard - Damaracherla S/S | ||||
LILO of 400kV HNPCL- Kamavarapukota TMDC line to proposed 400/220/11 kV Guddigudem S/S | ||||
Lahal GISS - Chamera (PS) (Both Ckts.) | ||||
Bus Extn. from Old Switchyard - New Switchyard for evacuation arrangement for 1x660MW Generation of Bhusawal | ||||
Various DTLs from Solar Park-Pavagada (PS) | ||||
Kalaburagi (Ferozabad) MC tower of 400kV YTPS -BPS line near Merched Village at Kalaburagi | ||||
Kamuthi - Newly constructed Ottapidara | ||||
Manali - Pulianthoppe | ||||
LILO of both circuits of 400kV Khammam - Mamidipally to Choutuppal S/S | ||||
Total | ||||
Private Sector | ||||
Extn. ofESSAR-Lakadia/Bhachau (Tripple snow bird) line upto Jamkhambaliya PS | ||||
Jaunpur -Obra (Twin) | ||||
LILO of 2nd Ckts. of Zebra -Ranchodpura 400 kV D/C line at Banaskantha (PG) PS | ||||
LILO of Bhachau - EPGL (Tiple) line at Lakadia PS | ||||
North Karanpura - Chandwa (Jharkhand) NKSTPP line (NKTL -TBCB) | ||||
North Karanpura - Chandwa (Jharkhand) PS line (NKTL -TBCB) | ||||
Adani Generation Switchyar-Fatehgarh (PS) | ||||
Avaada Energy Private Limited -Bikaner (PS) | ||||
Ayana Renewable Power One Pvt. Ltd. Plant- Bikaner (PS) | ||||
Ayana Renewable Power Three Power Plant Common (PS) of Ayana Renewable Power One and Three Pvt. Ltd. -Bikaner (PS) | ||||
Common Pooling Point of both Azure Bikaner 500MW Plants -Bikaner | ||||
RENEW (Jharkhand Four) PowerPlant- Common (PS) of RENEW (Jharkhand Four) -Bikaner (PS) | ||||
ReNew Solar Power Plant Switchyard -Bikaner | ||||
Total | ||||
Total of 400 kV | ||||
230 kV | ||||
Central Sector | ||||
NTPC ltd -Tuticorin-II (GIS) | ||||
Total | ||||
State Sector | ||||
Vellalavidhuthi 400 kV SS - Nemmeli Thippayakudy 230 kV SS | ||||
Sembatty-Checkanurani | ||||
Ingur - Arasur (PGCIL) | ||||
RA Puram-Mylapore Feeder UG Cable | ||||
230 kV D/C line on tower with Zebra conductor for rerouting the existing 230kV PUSHEP - Arasur and Shenbagapudur- arasur feeders in between loc. 306- 309 | ||||
Basin Bride - Pulianthope (UG Cable) | ||||
Extn. of new EGT supply Laying of 230kV XLPE AI UG cable for a route length of 1Km from CTT tower - Metering point inside consumer premises | ||||
Tondiarpet SS to Pulianthope GIS SS (UG Cable) | ||||
Vellalaviduthi 400 kV SS - Thuvakudy 230 kV SS | ||||
LILO of Existing Paramathi - Alundur at Valayapatty | ||||
LILO of T. Sipcot -Savasapuram 230kV Feeder - the Ottapidaram | ||||
Total | ||||
Private Sector | ||||
Betam Wind Energy-Tuticorin-II | ||||
Green Infra Renewable- Tuticorin-II | ||||
GRT Jewllers (India) Private Limited-Tuticorin-II (GIS) | ||||
JSW Future Energy Ltd-Tuticorin-II | ||||
Mytrah Wind Farms-Tirunelveli (PS) | ||||
Orange Sironj - Tuticorin-II | ||||
Sprng Renewable-Pugalur | ||||
Total | ||||
Total of 230 kV | ||||
220 kV | ||||
Central Sector | ||||
MTPS - Ramgarh (Bypassing Gola SS) | ||||
MTPS- Ranchi (PG) (Bypassing Gola SS) | ||||
Guna-Shivpuri line | ||||
Parulia - Burdwan line | ||||
Bhind -Morena line | ||||
Guna - Guna line | ||||
Disconnection of 220 kV LILO Arrangement of Dhauliganga - Bareilly at Pithoragarh and Connecting it to Jauljivi (one ckt charged | ||||
Disconnection of 220kv LILO arrangement of Dhauliganga -Bareilly at Pithoragarh and Connecting it to Jaulivi (balance one Ckt. charged) | ||||
UT Chandigarh s/s -Punchkula (PG) s/s line under establishment of 220kV GIS at UT Chandigarh along with 220 kV D/C line from Chandigarh GIS to 400/220kV Punchkula (PG) s/s (Only Ckt.-1) | ||||
NTPC Ltd 300MW Power Plant-Bhadla-II (PS) | ||||
NTPC Ltd (90MW) Power Plant -Common (PS) of NTPCs (150MW) and (90MW) Solar Project at Devikoot- Fatehgarh-II (PS) | ||||
Solar Project at Devikoot(150MW) -Fatehgharh-II (PS) | ||||
Re-conducting of Alipurduar - Solakati 220kV line with Single GTLS conductor under NERSS-XII | ||||
UT Chandigarh S/s - Panchkula (PG) s/s line under Establishment of 220/22 kV GIS at UT Chandigarh along with 220 kV D/C line from Chandigarh GIS- 400/220 kV Panchkula (PG) s/s (Ckts-II ) | ||||
(Assam) Rangia - Amingaon line | ||||
(Assam) Tinsukia - Behiating (new Dibrugarh) | ||||
(Nagaland) New Kohima - Mokokchung (PG) | ||||
(Sikkim) Rangpo (PG) - Samardong | ||||
Total | ||||
State Sector | ||||
Biharsharif - Asthawan (New) | ||||
Saharsa (New) - Khagaria (New) | ||||
Pirana (PG) - Barejadi line | ||||
LILO of 2nd Ckts. of 220kV Kunihar- Panchkula line | ||||
Sector 69-Sector72 Ckt.-II | ||||
Kodungallur - Irinjalakuda | ||||
Eklahare - Pimpalgaon | ||||
Passian-Dhablan line (Railway) line | ||||
LILO of Lakhwar- Dehradun at Vyasi | ||||
Dindi -Existing Kondamallepally line | ||||
LILO of 220kV Roza-Budaun at Datagang (220) line | ||||
LILO of One ckt 220 kV Sohawal (PG) -New Tanda line at Ayodhya (220) | ||||
LILO of one ckt. Fatehpur-Unchahar at Malwan | ||||
Muzaffarpur (PG) - Gouraul line | ||||
LILO of both Ckts. 220kV Tharad-Deodar line at Mera s/s with AL-59 Conductor line | ||||
Benkikere S/s - proposed Hosadurga line | ||||
Pandiabili PGCIL - Pratapsasan line | ||||
Barabanki - Satrikh Road line | ||||
LILO of 220kV Sambhal -Chandausi line at Sambhal (400) | ||||
Rajarhat (PGCIL) - Barasat 220kV s/s | ||||
Kalapaka -HPCL-I and II | ||||
LILO of VTS Ckt.-I Kamavarapukota at Nuziveedu line | ||||
LILO of Ara (PG) - Khagaul (BSPTCL) at Naubatpur (New) | ||||
Naubatpur (New) - Bhusaula (New) | ||||
Naubatpur (New) - Bihta (BSPTCL) | ||||
Sheiikhopursarai-Asthawan (New) | ||||
LILO of both Ckts. pf 220kV Bhimasar-Chardava line at proposed 220kV Vankada (Nichi Mandal) with AL-59 conductor with OPGW | ||||
Shapar - Babara line (AL-59) | ||||
Dehan - Hamirpur | ||||
Sunda-Hatkoti | ||||
LILO of both Ckt. of 220kV RTPP Salempur at 220kV S/S at Bakana (Ckt.-I) | ||||
LILO of both Ckt. of 220kV RTPP Salempur at 220kV S/S at Bakana (Ckt.-II) | ||||
Vijayapura proposed -Aaheri line | ||||
LILO point -PGCIL Indore at Indore (NZ) line | ||||
Rewa 220 - Rewa UMSP 220kV line | ||||
LILO on 220kV ONGC-Panvel S/S at 220kV Panvel TSS | ||||
LILO of KTPS V-Lower Sileru-II - proposed Pump House- 1 at B.G. Kottur | ||||
Karmnasa (New) - Pusauli (BSPTCL) (TM) | ||||
Raxaul (New) - Gopalganj (TM/ Single Zebra) | ||||
Saharsa (New) - Begusarai | ||||
Dwarka -PPK -II U/G | ||||
Tughlakabad - R.K.Puram (U/G Cable) | ||||
Badhana - Dadri Toe Jhajjar | ||||
LILO of Nagda -Daloda line at Nagda (220kV) line | ||||
Amrapur - Thaptitanda line | ||||
LILO of Budhipadar - Tarkera at Bamra | ||||
LILO of 220kv Sambhal -Gajraula line at Sambhal (400) | ||||
Wadakkanchery - Kunnamkulam | ||||
LILO on 220kV Badnera - Dhamangaon line for 150MW Solar plant of M/s Avadhaa at Dhamangaon Dist Amravati | ||||
Jalandhar (PGCIL) - Kartarpur | ||||
Damaracherla - Miryalaguda (Ckt.-I) | ||||
LILO of 220kV Gonda (400) - Bahraich line at Balrampur (220) | ||||
LILO of 220kV Hardoi - Sahjahanpur (PG) at Mallawan (220) | ||||
LILO of 220kV Jahangirpur (765)-IITGNL line at Jewar (220) | ||||
LILO of 220kV Sarojini Nagar - Bachhrawan line at Vijnor (220) | ||||
LILO from existing 200kV HSR -Hoody line (proposed GIS) at Shobha Dream Acres line | ||||
LILO on existing 220kV Ahemadnagar - Bhose line for 400 kV Karjat S/s | ||||
Barnala - Handiaya Rly. S/Stn. (Railway Deptt.) | ||||
LILO of 220kV Meerut - Amroha at Chandpur line | ||||
LILO of 220 kV Panki (220) - Bhauti (PG) Kanpur (400) line at Kidwai Nagar Govindnagar (Kanpur) line | ||||
Modipuram-II Bagpat PG line | ||||
Rajarhat (PG) - Newtown- II C 220kV DC/CKt. UG Cable line | ||||
LILO of 220kV Chorania - Sadla line and 220kV Sadla- Gondal line at 220kV Shapar s/s | ||||
Panchgaon 400 kV - Panchgaon 220 kV | ||||
Vairag- Avaada Solar Park | ||||
LILO on 220kV Girwali - Hingoli line at 220kV Kurunda S/S | ||||
LILO of Balimela-Malkangir line at Kalimela | ||||
Gajwel - Siddipet line (on Galvanized Towers with Mosse ACSR) | ||||
Bareilly (400) - Amaria line | ||||
Rasra (400) - Bhadaura (Gazipur) line | ||||
2nd Circuit stringing of 220kV Darbhanga (400/220)- Samastipur (New) line | ||||
Muzaffarpur (PG) - Chhapra (New) | ||||
Ambetha- Devdha | ||||
LILO of one Ckt of 220kV D/C Amreli - Babara line at proposed 220kV Patkhilori | ||||
220kV D/C line from 765kV S/stn. PGCIL Bhiwani to 220kV S/stn HVPNL Bhiwani | ||||
LILO of one Ckt. 220kV D/C FGPP- Pallaline at 220kV S/S Sector-78 Faridabad | ||||
220kV SCDC line from 220kV Ner S/S - 100MW Solar power plant by M/s. Avaada MH Solar Pvt. Ltd. | ||||
LILO of Kharghar -Kalwa (TIFFII-(Trombay section) at Pawne S/S by underground cable | ||||
Damaracherla - Miryalaguda (Ckt.-II) | ||||
Raebareli (400) - Sangipur line | ||||
LILO of VTS- 3 and 4 -Piduguralla | ||||
Pulivendula - Mutyalacheruvu | ||||
LILO of Hiranagar-Gladni at Chowadhi | ||||
LILO on 220kV MC/DC towers from 220kV Narendra- Haveri line to proposed S/S (for a distance of 2.418 kms) | ||||
Mundayad - Thalasseri line | ||||
LILO of one Ckt. of Bhopal -Ashta line at 220kv Bairagarh line | ||||
Koradi-II - Uppalwadi UG and O/H line | ||||
LILO of Budhipadar - Tarkera at Kuanramunda | ||||
Kethireddypally - Chandanvally s/s | ||||
Galiveedu PSS-1-NP Kunta (CKt.-I) | ||||
Galiveedu PSS-1- NP Kunta (Ckt.-II) | ||||
Galiveedu PSS-3-NP Kunta (Ckt-1) | ||||
Galiveedu PSS-3-NP Kunta (Ckt.II) | ||||
NP Kunta PSS2-NP Kunta (CKt.-1) | ||||
NP Kunta Pss2-NP Kunta (Ckt-2) | ||||
NP Kunta PSS3-NP Kunta (Ckt-1) | ||||
NP Kunta PSS3-NP Kunta (Ckt-2) | ||||
NP Kunta PSS4 -NP Kunta (Ckt-1) | ||||
NP Kunta PSS4 -NP Kunta (Ckt-2) | ||||
LILO of Jetpur - Sardargadh line at Shapur s/s | ||||
LILO on Lalpar - Sartanpar line at Wankaner (M/C tower by replacement of existing 132kV towers) (AL- 59) | ||||
Chatra - Pakribarwadih | ||||
Tibber -Sohal line | ||||
Chibramau- Farrukhabad line | ||||
LILO of Jaunpur -Gajokhar at Junpur LIne | ||||
LILO of one Ckt of Azamgarh-II -Bhadoi line at Machhlisahar (Jaunpur) | ||||
LILO of Sarnath - Sahupuri at Bhadaura | ||||
LILO of VSS - Kakinada line at Parawada in Visakhapatnam States/UTs | ||||
LILO of Khagaul (BSPTCL) - Sipara (BSPTCL) at Jakkanpur (New) | ||||
Maszid Moth - Tughlakabad (U/G) Cable | ||||
LILO of Jetpur-Visavadar line at Bhesan s/s | ||||
Jagalur (Hiremallanahole) - Chitradurga | ||||
Kalaburagi (Ferozabad) Line1 from proposed Kalaburagi s/s (Ferozabad) - Existing line at Shahabad (Sedam) | ||||
Kalaburagi (Ferozabad) line 2 from proposed 400/220 kV Kalaburagi s/s - Existing 220kV S/C line from Shahapur-Kapnoor line at Shahapppur | ||||
LILO from Kothipura - Tubinakere at Channapatna | ||||
LILO line on M/C Towers from 220kV RTPS - Sedam - Ramasamudra S/S | ||||
Aug. of 1st Ckt from Rajpura - Mandi Gobindgarh 1 with HTLS | ||||
Aug. of 2nd Ckts from Rajpura-Mandi Gobindgarh 1 with HTLS | ||||
Malout - Abohar | ||||
Verpal-Dhukhniwaran line | ||||
Balotra -HRRL (Refinery) HPCL Rajasthan Refinery Ltd line from 220kV GSS RVPNL Balotra | ||||
Bhiwadi -DFCCIL TSS Mundana (Deposit work of DFCCIL Railway) | ||||
Jodhpur (400 kV GSS) - Banar | ||||
Samardong - Dikchu Pool line | ||||
LILO of both circuits of Malkaram - Narketpally to Choutuppal SS (Multi circuit towers) | ||||
Boner - Aligarh (400) line | ||||
LILO of 220kV Muzaffarnagar - Modipuram (220) at Khatauli (220) | ||||
LILO of Moradabad (400) - Rampur (220) at Rampur (765) line | ||||
LILO of KTPP-Howrah at Proposed Food Park (GIS) s/s | ||||
Total | ||||
Private Sector | ||||
ABC Bhadla Solar Power Plant -Bhadla-II P(S) | ||||
ACME Bhadla Solar Power Plant-Bhadla | ||||
ACME Solar Holdings Ltd. Power Plant - Bhadla -II (PS) | ||||
Adani Green Energy Nine Solar Power Project- Fatehgarh-II (Scope od ISTS) | ||||
Adani Grren Energy Seven Ltd. Plant -Fatehgarh-II (PS) | ||||
Alfanar -Energy Private Limited (AEPL-Kotda Madh) - Bhuj (PS) | ||||
CLP India Private Limited -Jam Khambhaliya (PS) | ||||
Mahoba Solar Power Plant Switch YArd -Bhadla | ||||
Mahoba Solar (UP) Private Limeted Power Project- Fatehgarh-II (New) PS | ||||
Mahoba Solar (UP) Private Limited-Bhadla | ||||
AREPRL Solar Park-Bhadla | ||||
Avaada Energy Pvt Ltd Solar Power Plant - Bhadla-II (PS) | ||||
Avikiran Solar India Private Limited -Bhuj PS | ||||
Avikiran Surya India Pvt. Solar Power Plant- Bikaner PS | ||||
Chhugar PS -Dayapar/Ratadiaya (PS) | ||||
Dayapar / Ratadiya PS-Bhuj (with Capacity of at least 725 MW at Nominal Voltage) | ||||
Murchbana/Mokhra PS - Dayapar/Ratadiya (PS) | ||||
SBESS-Indore (PG) | ||||
Azure 130MW Plant-Bhadla | ||||
AZURE Solar PV Plant -Bhadla-2-Bhadla | ||||
AZURE Solar PV Plant Bhadla -Bhadla | ||||
IWISL (Dayapar)-Bhuj (PS) | ||||
EDEN Cite ISTS RAj Power Plant -Fatehgarh-II (New ) (PS) | ||||
Essel Solar Park- Bhadla | ||||
Green Infra Wind Energy Ltd. (GIWEL) -(Bhuj) - Bhuj (PS) | ||||
Green Infra Wind Energy Ltd. (GIWEL-Roha)- Bhuj(PS) | ||||
Hero Solar Generation Switchyard-Bhadla | ||||
IWISL -Bhuj (PS) | ||||
Mahindra Susten 250MW Solar Project-Bhadla | ||||
Mahindra Susten Solar Power Project- Bhadla-II | ||||
Netra-Bhuj (PS) | ||||
OKWPL - Bhachau (PS) | ||||
POWERICA Ltd. -Jam Khambaliya (PS) | ||||
ReNew Wind Energy (AP2) Private Limited- Bhuj (PS) | ||||
ReNew Power Limited -Hiriyur | ||||
RPVPL- Bhachau | ||||
Construction 220kV S/C each from Jaisalmer I Project and Jaisalmer-II Project upto Common point of Jaisalmer -I Project and Jaisalmer-II Project-II - Fatehgarh-II | ||||
Construction 220kV S/C line from Jaisalmer I Project and Jaislamer II Project upto common point Common point of Jaisalmer -I Project and Jaisalmer II Project - Fatehgarh -II | ||||
Jaisalmer-3 Plant - Fatehgarh-II | ||||
Jaisalmer-4 Project-Fatehgarh-II (PS) | ||||
RUMS Ltd. Switchyard -Rewa (PS) | ||||
SBE Renewables Ten Private Ltd Power Project- Fatehgarh-II (PS) | ||||
SBER Eleven Solar Power Project -Bikaner | ||||
SEI Sunshine PSS_Shivpuri (MPPTCL) | ||||
Sherisha Rooftop Solar SPV Four Private Ltd.- Raipur (Capacity at least200MW at Nominal Voltage) | ||||
Sitac-Bhuj-II | ||||
SESPL -Bhuj-II | ||||
Tata Power Green Energy Ltd Solar Power Plant-Bikaner-I (PS) | ||||
Tata Power Renewable Energy Limited-Bhadla | ||||
TPREL 500 MW Solar Power Project Chhayan- Bhadla | ||||
Total | ||||
Total of 220 kV | ||||
Grand Total |