Station-wise Energy Plant Load Factor in Central Sector (Nuclear) in India (July, 2018) | |||||
Stations | Monitored Capacity (In MW) | Target (April 2018 to March 2019) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Month (2017-2018) | |||
Private Sector Utilities-Hydro | |||||
Bhira HPS | |||||
Bhira PSS HPS | |||||
Bhivpuri HPS | |||||
Khopoli HPS | |||||
Total | |||||
Private Sector IPP-Hydro | |||||
Allain Duhangan HPS | |||||
Baspa HPS | |||||
Bhandardhara HPS ST | |||||
Budhil HPS | |||||
Chanju-I HPS | |||||
Chuzachen HPS | |||||
Dikchu HPS | |||||
Jorethang Loop | |||||
Karcham Wangtoo | |||||
Maheshwar HPS | |||||
Malana HPS | |||||
Malana-II HPS | |||||
Singoli Bhatwari HPS | |||||
Sorang HPS | |||||
Srinagar HPS | |||||
Tashiding HPS | |||||
Tidong HPS | |||||
Vishnu Prayag HPS | |||||
Total | |||||
Total Private Sector | |||||
Central- Nuclear | |||||
DAE (Rajasthan) | |||||
Kaiga | |||||
Kakrapara | |||||
Kudankulam | |||||
Madras APS | |||||
Narora APS | |||||
Rajasthan APS | |||||
Tarapur | |||||
Total Nuclear |