Station-wise Energy Plant Load Factor in Central Sector (Nuclear) in India (August, 2023) | |||||
Stations | Monitored Capacity (In MW) | Generation Target (2023-2024) (In GWh) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Month (2022-2023) | |||
DAE (Rajasthan) | |||||
Kaiga | |||||
Kakrapara | |||||
Kudankulam | |||||
Madras APS | |||||
Narora APS | |||||
Rajasthan APS | |||||
Tarapur | |||||
Total Nuclear |