Basin-wise Status of Hydro Electric Power Potential Development (In Terms of Installed Capacity-Above 25 MW) in India
(As on 31.03.2016 to 31.11.2021 and 31.03.2023)
This information is available only to registered Subscriber.
Existing Subscriber please login by providing your and
or IP Access User click for login.