Installed Capacity and Actual Generation of Hydro Electric Stations (Installed Capacity Above 25 MW) in Chhattisgarh (2016-2017 to 2019-2020-upto 30.05.2019) | |||||
Station/Utility | Installed Capacity (In Mega Watt) As on 30.05.2019 | Generation (In Million Unit) | |||
2016-2017 | 2017-2018 | 2018-2019 | 2019-2020 (upto 30.05.2019) | ||
Chhattisgarh State Power Generation Company (CSPGC) | |||||
Hasdeo Bango | |||||
Total | |||||
Total Chhattisgarh | |||||
India |