Position of Power Generation in Chhattisgarh (As on 01.12.2000, 2008-2009 and 2009-2010) | ||||
Items | Unit | 01.12.2000 | 2008-2009 | 2009-10* |
Installed Capacity | ||||
Total | ||||
Thermal | ||||
Hydel | ||||
Co-gen. | ||||
Unit Generation | ||||
Total | ||||
Thermal | ||||
Hydel | ||||
Co-gen. | ||||
Auxiliary Consumption | ||||
Total | ||||
Thermal | ||||
Hydel | ||||
Co-gen. | ||||
Auxiliary Consumption to Total Generation in Percentage | ||||
Thermal | ||||
Hydel | ||||
Co-gen. | ||||
Units Sent OutĀ | ||||
Total | ||||
Thermal | ||||
Hydel | ||||
Co-gen. | ||||
Unit Sent Out Ratio | ||||
Thermal : Hydel | ||||
Peak Demand Met | ||||
Thermal PUF | ||||
Average Generation per KW of Installed capacity (Thermal) | ||||
Fuel ConsumptionĀ | ||||
Oil | ||||
Coal | ||||
Specific Fuel Consumption | ||||
Oil | ||||
Coal |