Station-wise Energy Generation in Chhattisgarh | |||||||
(2015-2016-upto May 2015) | |||||||
(In GWh) | |||||||
Sectors/Stations | Monitored Capacity (MW) | Total (April 2015 to March 2016) | Program | Actual* | Actual Same Period (2014-15) | % of Program (Actual /Program) | % of Last Year (Actual/Actual Same Period) |
State Sector | |||||||
Dspm TPS | |||||||
Korba-Ii | |||||||
Korba-Iii | |||||||
Korba-West TPS | |||||||
Marwa TPS | |||||||
CSPGCL Coal | |||||||
State Thermal | |||||||
Hasdeobango HPS | |||||||
CSPGCL Hydro | |||||||
State Hydro | |||||||
Pvt Sector | |||||||
Chakabura TPP | |||||||
Kasaipalli TPP | |||||||
Swastik Korba TPP | |||||||
ACB Coal | |||||||
Balco TPS | |||||||
Balco Coal | |||||||
Baradarha TPS | |||||||
DBPCL Coal | |||||||
Raikheda TPP | |||||||
GCEL Coal | |||||||
Op Jindal TPS | |||||||
Tamnar TPP | |||||||
JPL Coal | |||||||
Avantha Bhandar | |||||||
Kwpcl Coal | |||||||
Pathadi TPP | |||||||
Lanco Coal | |||||||
Bandakhar TPP | |||||||
Mccpl Coal | |||||||
Uchpinda TPP | |||||||
Rkmppl Coal | |||||||
Ratija TPS | |||||||
SCPL Coal | |||||||
Binjkote TPP | |||||||
Sks Coal | |||||||
Svpl TPP | |||||||
Svppl Coal | |||||||
Trn Energy TPP | |||||||
Trne Coal | |||||||
Katghora TPP | |||||||
Vespl Coal | |||||||
Salora TPP | |||||||
Vvl Coal | |||||||
Akaltara TPS | |||||||
Wpcl Coal | |||||||
Pvt Thermal | |||||||
Central Sector | |||||||
Bhilai TPS | |||||||
Nspcl Coal | |||||||
Korba STPS | |||||||
Sipat STPS | |||||||
NTPC Ltd. Coal | |||||||
Central Thermal | |||||||
Total Thermal | |||||||
Total Hydro | |||||||
Total Generation |