Length of Roads and Cost of Various Ongoing Development Projects under National Highways (NHs) in Chhattisgarh (As on 01.09.2024) | |||
Projects | Length (In Kms.) | Total Project Cost (TPC) (Rs in Crore) | Likely date of Completion |
Rehabilitation and Upgradation of NH-200 (New NH-49) from Km 178.944 to 241.553 (Banari Village to Masania Kala Village Section) to Two -Lanes with Paved Shoulders in The State of Chhattisgarh Under NHDPIV on EPC Basis. (Job No. 200-Chh-NHDPIV-2015-16-24) | |||
Rehabilitation and Upgradation of NH-43 from Km 130.000 to 180.000(Kanker to Bedma Section) Package-II, to Two -Lanes with Paved Shoulders in The State of Chhattisgarh Under NHdp-Iv on EPC Basis. (Job No. 43-Chh- NHDPIV-2015-16-23) | |||
Rehabilitation and Upgradation of NH-78 from Km 373.505 to 469.300(Ambikapur Topathalgaonsection) to Two- Lanes with Paved Shoulders in The State of Chhattisgarh under NHDP-IV on EPC Basis. (Job No. 78-Chh- NHDPIV-2015-16-25) | |||
Rehabilitation and Upgradation of NH-78 from Km 469.000 to 531.000 (Patthalgaon to Kunkuri) to Two - Lane with Paved Shoulders in The State of Chhattisgarh Under NHDP- IV on EPC Basis. (Job No. 78-Chh- NHDPIV-2015-16-40) | |||
Rehabilitation and Upgradation of NH-12A from Km 246.849 To317.406 (Kawardha to Simga Section) in The State of Chhattisgarh to Two -Lanes with Paved Shoulders Under NHdp-Iv on EPC Basis. (Job No.12A-Chh-NHDPIV-2014-15-22) | |||
Rehabilitation and Upgradation of NH-111 from Km 163.400 to 215.800 (Shivnagar to Ambikapur Section) in The State of Chhattisgarh to Two -Lanes with Paved Shoulders Under NHdp-Iv on EPC Basis. (Job No. 111-Chh-NHDPIV-2015-16-17) | |||
Strengthening and Widening of Existing 2 Lane Road to Two Lane Paved Shoulder from Km 7.750 to 26.542 & Km. 32.093 to 45.786 Ofnh-130 on EPC Mode in The State of Chhattisgarh.(Job No. 130-Cg- 2017-18-348) | |||
Construction of 4 Nos Grade Separtor Between Km. 281.000 to Km. 307.600 (Km. 286.400Kumhari Km. 299.000 Transport Nagar Km. 302.000 Power House Km. 304.000 Chandra Moura Chowk to Km. 305.000 Supeia) of NH-53 Old NH-06) Raipur -Durg 4 Lane on EPC Mode in The State of Chhattisgarh Job No. NH-53 (Old NH-06) Cg-2017-18-56 | |||
Construction of High Level Bridges Across At Km. 372.050 (Bardela Nala), Km. 374.200 (Jangla Nala), Km. 404.150 (Mari River), Km. 414.350 (Tumnar River), Km. 337.200 (Singar Bahar River) & Km. 331.800 (Chinta Vagu River) on NH-63 (Old NH-16) Bhopalpattnam to Jagdalpur Roadon EPC Mode in The State of Chhattisgarh. (Job No. NH-63 (OLDNH-16) -2017-18-55 | |||
Widening & Strengthening Work in Km.25.530 to 31.540 = 6.010 Km of NH-30 (Old NH-221) of Jagdalpur-Sukma-Konta Raod | |||
Estimate For Construction of High Level Bridge Across Goriyabahar Nalla River in Km 299.130 on NH - 63 (Old NH-43) Jagdalpur- Vishakhapatnam Road in Thestate of Chhattisgarh | |||
Up-Gradation of NH-930 Sherpar to Kohka from Km.67+880 to Km.114+860 to 2L+Ps Inchhattisgarh Under EPC Mode | |||
One Time Improvement of Road from Km. 126.360 to 127.500 (Bhatagaon Realigned Portion. Km. 135.600 to 142.400 (Kharsia Bypassed Portion) and Km.150.800 to 180.400 (Raigarh Town Bypassed Portion) Total Length =37.540 Km. of NH-49 (Old NH-200) in The State of Chhattisgarh. | |||
Up-Gradation of NH-930 Jhalmala Sherpar from K. 30.600 to Km 67.800 to Two/Four Lanes with Paved Shoulder in The State of Chhattisgarh on Engieering Procurement and Contruction (EPC) Mode | |||
Up-Gradation of NH-130C Abhanpur to Paund from NH Km. 0+000 to Km 40+380 to Two Lane with Paved Shoulders in The Stateof Chhattisgarh on EPC Mode. | |||
Up-Gradation of NH_130C Madangmuda Debhog Odisha Km 168.800 to Km 196.400 to Two Lane with Paved Shoulder in The State of Chhattisgarh on Engineering Procrement (EPC) Mode | |||
Reconstruction of Minor Bridge At Km .99.800 to Km 100.600 (Geedam Nala) & Major Bridge At Km 59.000 to Km. 59.600 (Guter Naalla) on NH_30 (Old NH-221) Inthe State Of | |||
One Time Improvement of Sakti Bypass Road in Ch. 225.500 To240.500 = 15.00 Km on New NH-49 (Old NH-200). | |||
One Time Improvement of Road in Janjgir Champa By Pass Ch 179.130 to 206.100 _ 26.970Km,Saragaon Bypass Ch 207.100 To 210.200 _3.100Km, Risda Bypass Km 211.200 to Km 212.700 _ 1.500Km and Sakreli Rob Km 218.780 to Km 220.341 _1.561 Kmtotal Length _ | |||
Construction of 2-Lane Bituminous Road from Km. 0.000 to 36.00 Bhopalapatnam- Ventapuram-Warangal-Hyderabadroad Under Lwe Scheme in The State of Chhattisgarh. | |||
4-Laning of Raipur- Kodebad Section from Km 10.2 to 43.4of NH-43 (New NH-30) Under EPC Mode | |||
4-Laning of Kodebad- Dhamtari Section from Km. 43.4 to 82.209 of NH-43 (New NH-30) Under EPCmode | |||
Flyover and Junction Development At Tatibandh Chowk At Km 281.7 on Raipur-Aurang Section of NH-6(New NH-53) [Standalone Project] | |||
4-Lane with Paved Shoulder Configuration of Pathrapali Katghora of NH-111 from Km 53+300 to Km. 92+600 Under Hammode | |||
4- Laning of Champa–Korba– Katghora Section from Km. 0.000 to 38.200 of NH-149B Under NH(O) | |||
Bilaspur-Urga from Km. 0.00 to Km. 70.20 of NH-130A (Ham)Under Bharatmala Pariyojna | |||
Raipur-Vishakhapatnam from Km.0.000 to Km. 42.800 Under Economic Corridor in The State Ofchhattisgarh (Pkg-I) | |||
Total | |||