Status on Works of Highways Projects in Chhattisgarh (As on July, 2022) | |||||
Projects | Length (In Km) | Sanctioned/ Awarded Cost (Rs. in Crore) | Expenditure (Rs in Crore) | Actual/Likely date of Completion | Present Status |
4-Laning of Raipur-Kodebad Section from Km 10.200 to 43.400 of NH-43 (New NH-30) | |||||
4-Laning of Kodebad-Dhamtari Section from Km. 43.4 to 82.209 of NH-43 (New NH-30) | |||||
4-Laning of Simga-Sargaon Section of NH-200 (New NH-130) from Km 48+580 to Km 91+026 | |||||
4-Laning of Bilaspur-Pathrapali Section from Km 0.00 to Km.53.300 of NH-111 (New NH-130) | |||||
4/6 Laning of Raipur-Simga Section of NH-200 (New NH-30) from Km 0+000 to Km 48+580 under EPC Mode | |||||
Flyover and Junction Development at Tatibandh Chowk at Km 281.7 on Raipur- Aurang Section of NH- 6 (New NH-53). | |||||
Improvement of Crust & Strengthening Work of Raipur-Durg 4- Lane (Including Improvement of Junction) in Km.281.00 to 307.600 of NH-53 (Old NH-06) | |||||
One Timeimprovement of Road in Masturi Bypass Km. 10.400 to 11.250=0.850, Km 14.200 To16.900= 2.700 Km, Km 18.042 to Km 25.206 =7.164 Km & Km 25.206 to 51.756 = 26.55 Km (Total Length= 37.264 Km) & Raising from Km 16.900 to 18.042 (Length= 1.142 Km) on NH-49 | |||||
Up-Gradation of NH-130C Abhanpur- Panduka from Km. 0+000 to Km 40+400To Two Lane with Paved Shoulders on Engineering, Procurement & Construction (EPC) Mode | |||||
Rehabilitation And Upgradation of NH-200 (New NH-49) from Km 127.500 to 178.944 (Village Theka/Darrighat to Village Banarisection) to Four/Two -Lane with Paved Shoulders Undernhdp-IV on EPC Mode. | |||||
Upgradation of Bilaspur-Takhatpur- Mungeli-Pandariya- Pondi Road on NH-130A Package–III (A) Takhatpur By-Pass from Existing Ch.26.542 to 32.093 [Design Ch. 18.700 to 25.900] & Mungeli By- Pass from Existing Ch. 45.786 to 56.275 [Design Ch. 29.600 to 51.600] and Package–III (B) Pandariya By- Pass from Existing Ch.82.582 to 87.133 [Design Ch. 77.900 to 81.1000 & Pondi By-Pass from Existing Ch.103.166 to 104.756 [Design Ch. 97.000 to 103.395] to Two Lane with Paved Shoulder Configuration On EPC Mode. | |||||
Upgradation of Keonchi - Ratanpur Road of NH-45 Package-II, from Design Chainage Km 278.75 to Km 321.348 to Two Lane with Paved Shoulders under Corridor Scheme On EPC Mode. | |||||
Construction of 4 Nos Grade Separator Between Km. 281.000 to Km, 307.600 (Km.286.400 Kumhari, Km. 299.000 Transport Nagar, Km.302.000 Power House, Km. 304.000 Chandra Moura Chowk to Km.305.00 Supela) of NH-53 Old NH-06) Raipur-Durg 4 Lane On EPC Mode . | |||||
Strengthening and Widening of Existing 2 Lane Road to Two Lane Paved Shoulder from Km 7.750 to 26.542 & Km. 32.093 to 45.786 of NH-130 On EPC Mode. | |||||
India |