Basin wise Identified Hydro-Electric Potential in Himachal Pradesh (2000-2001) | ||
Basin project | Estimated Potential (MW) | Remarks |
Yamuna Basin | ||
Rupin | ||
Tangnu Romai | ||
Dhamwari Sunda | ||
Andhra | ||
Chirgaon-Majhgaon | ||
Shalvi | ||
Renuka Dam | ||
Giri | ||
Yamuna Projects | ||
Sawara Kuddu | ||
Paudital Lassa | ||
Gumma SHP | ||
Sainj HEP | ||
Total | ||
Satluj Basin | ||
Rongtong | ||
Kealing Lara | ||
Lara Project | ||
Mane Nadang | ||
Nadang | ||
Lari Sumte | ||
Sumte Kathang | ||
Chango Yang Thang | ||
Yang Thang Khab | ||
Khab Pooh | ||
Pooh Spillo | ||
Jhangi Thopan | ||
Thopan Powari | ||
Shongtong Karcham | ||
Baspa Stage-l | ||
Rukti | ||
Baspa Stage-ll | ||
Karcham Wangtoo | ||
Bhaba Aug. P/House | ||
SVP Bhaba | ||
Nathpa Jhakri | ||
Ghanvi | ||
Rampur | ||
Nogli Stage-l | ||
Chaba | ||
Sorang | ||
Kol Dam | ||
Bhakra Dam | ||
Keshang Stage-l | ||
-Do- Stage-ll | ||
-Do- Stage-lll | ||
Tidong | ||
Ropa | ||
Total | ||
Beas Basin | ||
Allain Duhangan | ||
Malana | ||
Parbati Statge-l,ll & lll | ||
Larji | ||
Bean Satluj Link | ||
Uhl Stage-l | ||
Uhl Stage-ll | ||
Uhl Stage-lll | ||
Neogal | ||
Binwa | ||
Baner | ||
Khauli | ||
Gaj | ||
Pong Dam | ||
Kalath | ||
Patikari | ||
Sainj HEP | ||
Gada Gosain | ||
Fozal | ||
Chakku | ||
Baragaon | ||
Dhaulasidh | ||
Lambadug | ||
Total | ||
Ravi Baisn | ||
Bara Bhangal | ||
Bajoli Holi | ||
Holi | ||
Kutehar | ||
Gharola | ||
Kugti | ||
Harsar | ||
Bharmour | ||
Bharmour Micro | ||
Budhil | ||
Tunda Stage-ll | ||
Tunda Stage-l | ||
Hibra | ||
Chamera Stage -ll | ||
Sal-l | ||
Sal-ll | ||
Bhuri Singh P/House | ||
Baira Suil | ||
Chamere Stage-l | ||
Siul | ||
Saikhoti | ||
Total | ||
Chenab Basin | ||
Chhattru | ||
Tunsha | ||
Teling | ||
Sissu | ||
Gyspa Dam | ||
Chander Bhaga Link | ||
Billing | ||
Tandi | ||
Shansha | ||
Rashil | ||
Thirot | ||
Tinger | ||
Patam | ||
Triget | ||
Miyar | ||
Seli | ||
Dugli | ||
Sagpari | ||
Killar | ||
Dugar | ||
Total | ||
Mini/Micro Schemes | ||
Total | ||
Grand Total |