State-wise Physical and Financial Progress under Repair, Renovation and Restoration (RRR) of Water Bodies Scheme in Hindi Belt of India (As on 31.03.2021) | |||||||||||||
(Rs. in Crore) | |||||||||||||
States | No. of Water Bodies Included | Estimated Cost | Committed Central Share (CA) | Potential Planned (In Hectare) | Targeted Storage Revival Minimum Control Measures (MCM) | Cumulative CA Released during XII Plan upto 03/19 | CA Released during 2019-2020 | CA Released during 2020-2021 | Cumulative CA Released During XII Plan & Onwards upto 31.03.2021 | Cumulative Expenditure upto 31.03.2021 | No. of Completed Water Bodies upto 31.03.2021 | Potential Resorted (In Hectare) | Storage Revived (MCM) |
Bihar | |||||||||||||
Madhya Pradesh | |||||||||||||
Rajasthan | |||||||||||||
Uttar Pradesh | |||||||||||||
Uttarakhand | |||||||||||||
Hindi Belt | |||||||||||||
India |