Capacity Sanctioned and Installed of Grid Connected Solar Power Plants under Various Component of Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyan (PM-KUSUM) Scheme in Jammu & Kashmir (As on 30.06.2023) | |||||||
UT | Component-A (In MW) | Component-B (In Nos.) | Component-C (In Nos.) | ||||
Sanctioned | Installed | Sanctioned | Installed | Sanctioned (IPS) | Sanctioned (FLS) | Installed | |
Jammu & Kashmir | |||||||
India |