Station-wise Energy Plant Load Factor in Jammu and Kashmir (July, 2020) | |||||
Sectors/Stations | Monitored Capacity (In MW) | Generation Target (2020-2021) (In GWh) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Month (2019-2020) | |||
A. State Sector | |||||
Pampore GPS (Liq.) | |||||
Jammu and Kashmir State | |||||
Power Development Corporation | |||||
Ltd (JKSPDC) Natural Gas | |||||
State Sector Natural Gas | |||||
Baglihar HPS | |||||
Baglihar-II HPS | |||||
Lower Jhelum HPS | |||||
Upper Sindh-II HPS | |||||
JKSPDC Hydro | |||||
State Sector Hydro | |||||
B. Central Sector | |||||
Dulhasti HPS | |||||
Kishanganga HPS | |||||
Salal HPS | |||||
Sewa-II HPS | |||||
Uri-I HPS | |||||
Uri-II HPS | |||||
NHPC Hydro | |||||
Central Hydro | |||||
Total Natural Gas | |||||
Total Hydro | |||||
Jammu and Kashmir | |||||
India |