Status of Hydro Electric Capacity (Installed Capacity-above 25 MW) in Jammu and Kashmir (As on 31.03.2018) | ||||||||
State | Identified Capacity as per Reassessment Study (In MW) | Capacity Developed | Capacity Under Construction | Capacity yet to be Developed | ||||
Total | Above 25 | In MW | %age | In MW | %age | In MW | %age | |
Jammu and Kashmir | ||||||||
India |