Status of Hydro Electric Potential Development (Installed Capacity-Above 25 MW) in Jammu and Kashmir (As on 30.06.2012) | ||||||||||
State | Identified Capacity as per Reassessment Study | Capacity Developed | Capacity Under Construction | Capacity Developed+ Under Construction | Capacity yet to be Developed | |||||
Total (MW) | Above 25 (MW) | (MW) | (%) | (MW) | (%) | (MW) | (%) | (MW) | (%) | |
Jammu and Kashmir | ||||||||||
India |