Status of Hydro Electric Potential Development (Installed Capacity-Above 25 MW) in Jammu and Kashmir (As on 30.06.2014) | ||||||||||
State | Identified Capacity As Per Reassessment Study | Capacity under Operation | Capacity under Construction | Capacity under Operation + Under Construction | Capacity Yet to be Taken Up under Construction | |||||
Total (MW) | Above 25 MW (MW) | (MW) | (%) | (MW) | (%) | (MW) | (%) | (MW) | (%) | |
Jammu and Kashmir | ||||||||||
India |