Status of Hydro Electric Potential Development (In Terms of Installed Capacity - Above 25 MW) in Jammu and Kashmir (As on 30.06.2011) | ||||||||||
State | Idintified Capacity As Per Reassessment Study | Capacity Developed | Capacity under Construction* | Capacity developed + under Construction | Capacity yet to be Developed | |||||
Total | Above 25 MW | % | (MW) | % | (MW) | % | (MW) | % | ||
(MW) | (MW) | (MW) | ||||||||
Jammu and Kashmir | ||||||||||
India |