Status of Hydro Electric Potential Development (In Terms of Installed Capacity-Above 25 MW) in Jammu and Kashmir (As on 30.09.2013) | ||||||||||
State | Identified Capacity as per reassessment study | Capacity Under Operation | Capacity Under Construction | Capacity Under Operation + Under Construction | Capacity yet to be taken up under construction | |||||
(Total MW) | Above 25 MW | (MW) | % | (MW) | (%) | (MW) | (%) | (MW) | % | |
Jammu and Kashmir | ||||||||||
India |