Rural Electrification in Orissa (As on 31.3.1997 and 31.3.1998) | ||
Particulars | As on 31.3.1997 | As on 31.3.1998 |
Village Electrified | ||
L.I.Pumps | ||
Percentage of Village Electrification (As per 1991 Census) | ||
S.C. Villages Electrified (having 200 or more S.C. Population) | ||
Harijan Bastee electrified | ||
Street light provided | ||
Trival Villages Electrified | ||
Installation of Solar Photovoltaic Panel | ||
Kutiriyoti | ||
Sanctioned Strength of Employees | ||
Per Capita Consumption |