Achievement of Guru Nanak Dev Thermal Plant of Bathinda in Punjab (1998-1999 to 2002-2003) | |||||
(4x110=440 MW) | |||||
Thermal Plant | 1998-99 | 1999-2000 | 2000-01 | 2001-02 | 2002-03 |
Generation (In M.U.) | |||||
Plant Load Factor (%) | |||||
Coal Received (M.T.) | |||||
Coal Consumption (M.T.) | |||||
Coal Consumption (Kgm./KWH) | |||||
Oil Received (Kilo-Litre) | |||||
Oil Consumption (Kilo-Litre) | |||||
Oil Consumption (M.L./KW.H.) | |||||
Auxiliary Consumption (%) | |||||
Make Up Water (%) |