Installation of Decentralized/Off-Grid Renewable Systems/Devices in Rajasthan (As on 31.03.2012) | ||||||||||
State | Biomass Gasifier | Biomass (Non- Bagasse) (MW) | Waste to Energy (MW) | Aerogen/ Hybrid Systems (KW) | Watermills | Micro Hydel (KW) | Remote Village Electrification | |||
Industrial (KW) | Rural (KW) | Nos. | (KW) | Village (Nos.) | Hamlet (Nos.) | |||||
Rajasthan | ||||||||||
India |