Progress of Power in Rajasthan (As on March, 1999 to 2003) | |||||
Item | As on 3/99 | As on 3/00 | As on 3/01 | As on 3/02 | As on 3/2003 (Provisional) |
Generation | |||||
Installed capacity (MW) | |||||
(Own + partnership Projects & Allocation from centre) | |||||
Peak Demand (MW) | |||||
Generation (Net) & Purchase (M.KWH) | |||||
Energy Consumption (Annual Mkwh) | |||||
With in the state by Consumer | |||||
Outside the State | |||||
Transmission & Distribution Lines in Circuit Kilometers: | |||||
EHV Transmission Lines (ckt. Kms) | |||||
33 kV (ckt. Kms) | |||||
11 kV & Distribution lines (ckt. Kms) | |||||
Substation in Numbers (Capacity in MVA) | |||||
400 kV | |||||
220 kV | |||||
132 kV | |||||
66 kV | |||||
33 kV | |||||
Distribution Transformers | |||||
No. of Consumers (in ` 000) | |||||
Connected Load (in MW) | |||||
Rural Electrification | |||||
No. of Towns electrified | |||||
No. of villages electrified | |||||
No. of Pump set energised (000) | |||||
Harizens Basti electirfied |