 Project-wise Status of Standalone New Bypasses and Road Over Bridges (ROBs) on National Highways in Rajasthan
(As on December 2022 to June 2024) 
 Projects  Length
(In Km) 
 Sanction Cost
(Rs in Crore) 
 Physical
Progress
(%age) 
 Target Date
of Completion 
 Construction of 2-Lane Rob and Its Approaches in Lieu of Existing Level Crossing No. C-64 At KM
172.990 on Jodhpur Ajmer Road NH-65 in Statenagaur in The State of Rajasthan. 
        
 Construction of Proposed 4-Lane Rob and It Approaches in Lieu of Existing Level Crossing No. 43
At KM 13 of NH-162A in Fatehnagar. 
        
 Construction of Proposed 2-Lane Rob and It Approaches in Lieu of Existing Level Crossing No.
C-293 & A -292 At KM. 233/038 & 233/435 (Railway Ch. 738/8-9 & 738/4-5) on NH-112
in Thestate of Rajasthan. 
        
 Construction of 4 Lane Rob At KM 30/00 on NH- 162-E (Pali-Nadol Section) Crossing The Falna-
Marwar Railway Section At Lc No. C-67 Near Somesar in Pali on Epc Basis in Thestate of Rajasthan. 
        
 Construction of Proposed 4 Lne Rob and Its Approaches in Lieu of Existing Level Crossing No. 328A
At KM. 0.500 to NH-25E in Distt. Barmer of State Ofrajasthan 
        
 Construction of 4 Lne Rob At KM 102/00 on NH- 325 At Lc No. C-48 Atjalore in State of Rajasthan.         
 Construction of Balance Work of Proposed 2 Lane Rob and Its Approaches in Lieu of Existing
Level Crossing No. A-142 At KM. 1.0 on NH-709 Extn. Near Sadalpur Railway Station in State
Churu in The Stateof Rajasthan. 
        
 Construction and Widening of Rob At KM 76 of Old NH-116 (New NH-552E) Inswaimadhopur City         
 4-Laning of Dangiyawas (Km 96.595 of NH-112) To Jajiwal (Km 283.500 of NH-65 Nagaur Road)
Section- Package-I(Jodhpur Ring Road) 
        
 Four Laning of Karwar (Km 281+980 on Nh62 Nagaur Road) To Dangiyawas Section
Package-II (Design Length30.093 KM) of Jodhpur Ring Road in The State of Rajasthan
on EPC Modeunder Nhdp Phase-Vii 
        
 Construction of Balance Work of Six Laning of Jaipur Ring Road (Southern Corridor)
(Km. 0+300 to KM. 46+700) from Agra Road to Ajmer Road of NH-148C. 
        
 Nagaur Bypass from Existing KM166/260 to KM 180/500 of NH-65.         
 Construction of 4 Lane Ps Rohat Bypass from Starting from Designchainage KM 0.00 to KM 4.913.         
 Construction of Two Lane With Paved Shoulder of Kawai Bypass of New NH-752 (Old NH-90) from
KM 41+560To KM 50+650 (Design Ch-0+000 to 8+700) in Jhalawar in The State Ofrajasthan. 
        
 Construction of Two Lane with Paved Shoulder Configuration of (I) Chippa Barod Bypass of
New NH-752 (Old NH-90) from KM. 55+430 to KM 64+530 (Design Ch-0+000 to 8+300) & (II)
Improvement from KM 72+080 to KM 72+680 & KM 78+750 to KM 79+300 on NH-90 (Length
900M) (Total Length =9.2 KM) on EPC Mode. 
        
 Construction of 2 Lane with Paved Shoulder Aklera Bypass from KM. 90+840 on New NH-752 (Old
NH-90) to KM 387+400 on New NH-52 (Old NH- 12), (Design Ch-0+000 to 5+000), (Total Length
5.000 KM) on EPC Mode. 
        
 Construction of 2 Lane with Paved Shoulder for The Work of "Development of Remaining Sections
of NH-325 (Balotra to Sanderao Via Jalore) to 2 Lane With Paved Shoulder Configuration by
Construction of Bypasses For Town Portions : (1) Asotra- Brahmdham Bypass (2)Siwana Bypass
(3) Mokalsar Bypass (4) Major Realignment At Kathadi (5) Major Realignment At Bishangarh (6)
Jalore Bypass (7) Ahore Town Portion (8) Dujana Bypass in The State of Rajasthan" Onepc Mode 
        
 4 Lane Divided Carriageway from KM 0.000 (Km. 144.200 of NH-15 (New NH-68) to KM
21.042 (Km 160.700 of NH-15 (New NH-68)) Barmer Bypass of NH-15 (New NH-68) on Epc
Rnode Inthe State of Rajasthan. 
        
 Construction of Pratapgarh City Bypass 2 Lane With Paved Shoulder Configuration from
Existing KM 74.00 to KM 81.600 (Design Chainage KM 0+00 to KM 11+165) on NH-113
on Epcmode in The State of Rajasthan. 
        
 Construction of Two-Lane With Paved Shoulder For Rajgarh Bypass from Design Chainage KM 0.000
to KM5.400 & Pilani Bypass from Design Chainage KM 35.840 to KM 43.120On NH-709 Extn . 
        
 Upgradation to Two Lane With Paved Shoulder from Existing Chainage KM 207.700 (Design Ch.
208+550) to KM216.440 (Design Ch. 216+890) [Sagwara Bypass] & from Existing KM227.470
(Design Ch. 227+900) to KM244.060 (Design Ch. 235+00) [Garhi- Partapur Bypass] Section of
NH-927A in The State of Rajasthan on Epcmode. 
        
 Construction of Two Lane with Paved Shoulder For Fatehpur Bypass (Design KM 0.000 to KM 7.400),
Mandawa Bypass (Design KM 20.925 to KM27.300) & Jhunjhunu Bypass (Design KM 41.625 to
KM 54.689) of NH-11 Onepc Mode in The State of Rajasthan. 
        
 Construction of 2 Lane With Paved Shoulder Northern Bypass Phase-Ii of Kota City from
Design Chainage KM.0/0 (Km. 178+300 of Sh-33) to KM 12/915 (Km. 236+800 of NH-52)
Onepc Mode in The State of Rajasthan. 
        
 Total         
 India         
 
 
A storehouse of socio-economic statistical of 620 districts. A cluster of 11 associate websites
Provides election data for all 543 parliamentary and 4120 state assembly constituencies
A collection of over 4000 data-oriented publication in print, eBook, eFlipbook & web-based access formats
A comprehensive collection of Infographics, videos, maps and charts on various socio-economic and electoral Insights
An e-resource providing socio-economic statistical information about India, its states, sectors, regions, and districts.
A one-stop-app for all who are craving for the latest economic facts and figures of India.
One-of-a-kind online learning platform offering specialised courses and also providing interactive learning.
Twenty Four years of serving socio-economic and electoral research fraternity in india and abroad.
© Datanet India Pvt. Ltd.