Sector-wise Status of Fuel Supply/Consumption for Gas Based Power Stations in Tripura (2022-2023) | |||||||||||||||||
State | Power Station | Sector | Installed Capacity (In MW) | P/I | Actual Generation during the Year (In MUs) | Domestic Gas Allotted (In MMSCMD) | RLNG (Imported)-Long Term Contracts | Gas Consumed/Supplied (In MMSCMD) | Alternatefuel Used (KL) | ||||||||
Domestic | RLNG (Imported) | Total | Naptha | HSD | |||||||||||||
APM /Non-APM/PMT | KGD-6 (Firm) | Total | APM /Non APM/PMT | KGD-6/ Auctioned Domestic Gas | Total | Long Term | Spot | ||||||||||
Tripura | |||||||||||||||||
Total Central Sector | |||||||||||||||||
Total State Sector | |||||||||||||||||
Total PVT/IPP Sector | |||||||||||||||||
India |