Station-wise Energy Plant Load Factor in Tripura (March, 2020) | |||||
Sector/Stations | Monitored Capacity (In MW) | Generation Target (2019-2020) (In GWh) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Month (2018-2019) | |||
State Sector | |||||
Baramura GT | |||||
Rokhia GT | |||||
Tripura State Electricity | |||||
Corporation Ltd. (TSECL) Natural | |||||
State Natural | |||||
Central Sector | |||||
Agartala GT | |||||
Monarchak CCPP | |||||
NEEPCO Natural | |||||
Tripura CCPP | |||||
Oil and Natural Gas | |||||
Corporation (ONGC) Natural | |||||
Central Natural | |||||
Tripura Natural | |||||
Tripura | |||||
India |