Station-wise Energy Plant Load Factor in Tripura (September, 2018) | |||||
Sector/Stations | Monitored Capacity (In MW) | Target (April 2018 to March 2019) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Month (2017-2018) | |||
State Sector | |||||
Baramura GT | |||||
Rokhia GT | |||||
Tripura State Electricity Corporation | |||||
Ltd. (TSECL) Natural | |||||
State Natural | |||||
Central Sector | |||||
Agartala GT | |||||
Monarchak CCPP | |||||
NEEPCO Natural | |||||
Tripura CCPP | |||||
Oil and Natural Gas | |||||
Corporation (ONGC) Natural | |||||
Central Natural | |||||
Total Natural | |||||
Total Tripura | |||||
Doyang HPS | |||||
NEEPCO Hydro | |||||
Central Hydro | |||||
Total Hydro | |||||
India |