Cumulative Physical Progress under Road Connectivity Project for Left Wing Extremism Affected Areas (RCPLWEAs) in Delhi (2020-2021 to 2023-2024-upto 01.08.2023) | ||||||
UT | Sanctioned | Completed | Progress From (2020-2021 to 2023-2024-upto 01.08.2023) | |||
Road Length (In km) | No. of Bridges | Road Length (In km) | No. of Bridges | Road Length (In km) | No. of Bridges | |
India |