Allocation of Proceeds of Sovereign Green Bond (SGrB) in India (2022-2023 and 2023-2024) | ||
(Rs. in Crore) | ||
Ministry/Department | 2023-2023 (Revised Estimates) | 2023-2024 (Budget Estimates) |
Environment, Forests and Climate Change | ||
(i) National Mission for a Green India | ||
Total | ||
Housing and Urban Affairs | ||
(i) Metro projects (equity investment) | ||
Total | ||
New and Renewable Energy | ||
(i) Solar Energy (Kisan Urja Suraksha evam Utthaan Mahabhiyan (KUSUM )) | ||
(ii) National Green Hydrogen Mission | ||
(iii) Solar Energy (Solar Power (Grid)) | ||
(iv) Wind-Energy (Wind Power (Grid) | ||
Total | ||
Railways | ||
(i) Production of energy efficient three phase electric locos | ||
(ii) Dum Dum Airport New Garia via Rajerhat Construction of Metro Railway New Garia (Kavi Subhas) Biman Bandar | ||
(iii) Joka Binoy Badal Denesh Bagh via Majerhat Construction of Metro Railway | ||
Total | ||
Grand Total |