Sector/River Basin-wise Installed Capacity of Under Construction Hydro Electric Projects (Above 25 MW) by Various Agencies in Himachal Pradesh (As on 30th June 2023) | ||||||
State | Sector | Districts | River/Basin | Agencies | Installed Capacity (No. X Megawatt) | Capacity Under Execution (In Megawatt) |
Himachal Pradesh | ||||||
India |