Month/Sector-wise Status of Completed Projects (Costing Rs. 150 Crore and Above) in India (2019-2020-upto September 2019) | |||
(Rs. in Crore) | |||
Project | Original Cost | Original Date of Commissioning | Cumulative Expenditure |
April, 2019 | |||
Coal | |||
Nigahi OC Expansion Project 10 MTY to 15 MTY, Singrauli (Northern Coal Fields Limited)- [N06000033] | |||
Khadia Expansion Opencast Project (4 to 10 MTPA, 6 MTPA Incremental) (Northern Coal Fields Limited)-N06000091] | |||
Petroleum | |||
Distillate Yield Improvement Project (Coker) At Haldia Refinery (Indian Oil Corporation Limited)-[N16000175] | |||
Power | |||
Bongaigaon Thermal Power Project (National Thermal Power Corporation)-[N18000041] | |||
Tripura Gas Based Power Project (North East Electric Power Corporation)-[N18000071] | |||
Railways | |||
Jaipur-Ringus-Churu and Sikar-Loharu Guage Conversion (Nwr) (North Western Railway) -[N22000113] | |||
Road Transport and Highways | |||
Phalodi -Jaisalmer Section of NH-15 to Two/Four Lane With PS (National Highways Authority of India)-[N24000357] | |||
May, 2019 | |||
Coal | |||
Makardhokra I OC (Western Coal Fields Limited)-[N06000119] | |||
Petroleum | |||
Construction of 12 Offshore Supply Vessels (OSV) (Oil and Natural Gas Corporation Limited)-[N16000084] | |||
NW B-173A Development Plan forr Exploitation of Mukta Pay Central Sector Projects (Oil and Natural Gas Corporation Limited)-[N16000290] | |||
Power | |||
Western Region Strengthening Scheme-V (Power Grid Corporation of India Limited)- [N18000035] | |||
Kudgi STPP Stage 1 (National Thermal Power Corporation)-[N18000131] | |||
Solapur STPP (National Thermal Power Corporation)-[N18000133] | |||
Northern Region System Strengthening Scheme-XXX (Power Grid Corporation of India Limited)-[N18000158] | |||
Fgutpp, Unchahar Stage-Iv (1X500 MW) (National Thermal Power Corporation)-[N18000174] | |||
Associated Transmission System forr Nabinagar-II TIPS (Power Grid Corporation of India Limited)-[N18000222] | |||
Road Transport and Highways | |||
Cuddapah-Mydukur-Kurnool Km-167.750-356.502 Km PPP (BOT) National Highways Authority of India)-[N24000145] | |||
Jorbat-Barapani PPP (Annuity) (National Highways Authority of India)-[N24000180] | |||
Rehabilitation and Upgradation of NH-365 from Km 72.600 to 121.00 (Thanamcherla to Jamandlapallys EPC (Public Works Dept. of State)-[N24000241] | |||
Rehabilitation and Upgradation of NH-365 from Km 154.00 to 187.00 (Mangalwarpet to Mallaplly Sectio EPC (Public Works Dept. of State)-[N24000242] | |||
Yan to Nirmal Serehabilitation and Upgradation of NH-222 from Km 615.00 to 668.60 (Kalction) to TW EPC (Public Works Dept. of State)-[N24000243] | |||
Rehabilitation and Upgradation of NH-765 from Km 23.00 to 108.00 (Hyderabad to Dindi Section) toT EPC (Public Works Dept.. of State)-[N24000244] | |||
Rehabilitation and Upgradation of NH-221 from Km 71/2 to 121/0 (of Vijayawada-Jagdalpur Ap Border to EPC (Public Works Dept.. of State)-[N24000246] | |||
Construction of Godavari River Bridge Near Venkatpuram Including Approach Road on NH -202 under LWES (Public Works Dept.. of State)-[N24000249] | |||
Rehabilation and Upgradation of NH-222(61) Fom Km 284 to 337 (National Highways Development Project)-[N24000250] | |||
Rehabilation and Upgradation of NH-222(61) Fom Km 161.570 to 211.00 EPC (National Highways Development Project)-[N24000255] | |||
Construction of 13.0 Km 2 Lane with Paved Shoulders Kollam Bypass on NH-47 (New NH- 66) from Km 486/50 EPC (Public Works Dept.. of State)-[N24000261] | |||
Rehabilitation and Up-Gradation of NH-221 (New NH-30) from Km 32.735 to Km 71.200 (Chandragudem to a EPC (Dept. of Road Transport and Highways)-[N24000262] | |||
Rehabilitation and Upgradation of NH-67 from Km 589/0 to 641/0 (Mydukur to Dornala T- Junction ) (Public Works Dept.. of State)-[N24000263] | |||
Rehabilitation and Upgradation of NH-67 from Km 695.000 to Km 741.950 (Atmakurâ?" Nellore Section) in EPC (Public Works Dept.. of State)-[N24000265] | |||
Rehabilitation and Upgradation from Km.425 400 to 509 400 NH-565 of Penchalakona to Yerpedu Contract (Public Works Dept.. of State)-[N24000266] | |||
Rehabilitation and Upgradation of NH-565 from Km 294.00 to 361.327 (Vaggampalle- Dornala T-Junction) EPC (Public Works Dept.. of State)-[N24000267] | |||
Rehabilitation Upgradation of NH-67 from Km 641.000 to Km 695.000 (Dornala T Junction to Atmakur Sec EPC (Public Works Dept.. of State)-[N24000268] | |||
Rehabilitation and Upgradation of NH-18 from Km 57/0 to Km 108/850 Pileru to Rayachoty Section to T EPC (Public Works Dept.. of State)-[N24000269] | |||
Rehabilitation and Upgradation of NH-42 (Old No.205) from Km.134/0 to 202/050 (Mudigubba to Ananthap EPC (Public Works Dept.. of State)-[N24000272] | |||
Rehabilitation and Up-Gradation of NH-221 (New NH-30) from Km 0.0 to 32.735 (Ibrahimapatnam to Chandr EPC (Ministry of Road Transport and Highways)-[N24000273] | |||
Construction of Hl Bridge across Gadavari River and Its Approaches for Missing Link between Sironcha Item Rate(Ministry of Road Transport and Highways)-[N24000277] | |||
Rehabilitation and Up Gradation of NH-43 from Km.81.500-Km 130.00 Dhamtari-Kanker Section. EPC (Public Works Dept. of State)-[N24000278] | |||
Rehabilitation and Upgradation of NH-43 Km. 180.00 to 241.00 (Bedma-Dahikonda) under NHDPIV EPC (Public Works Dept.. of State)-[N24000279] | |||
Rehabilitation and Upgradation of NH-43 Km. 241.000 to 298.000 (Dahikonda to Jagdalpur) under NHDP-I EPC (Public Works Dept.. of State)-[N24000280] | |||
Construcion of 2 Lane Road from Km. 28700-292.00, 322.00-342.00 and 352.00- 400.00 of NH 63 (Old NH-Item Rate (Public Works Dept.. of State)-[N24000283] | |||
Rehabilitation and Upgradation of Existing NH-565 of from Km.154.900 to 198.694 of Davulapally to EPC (Public Works Dept.. of State)-[N24000284] | |||
Rehabilitation and Up Gradation of NH-12A from Km246.849-Km 317.406 Kawardha- Simga Section. EPC (Public Works Dept. of State)-[N24000286] | |||
Rehabilitation and Upgradation of NH-64 from Km.0.00 to 28.110 (Zirakpur to Patiala Sec.) to 4 Lane I EPC (Ministry of Road Transport and Highways)-[N24000288] | |||
Rehabilitation and Upgradation of NH-64 from Km.28.110 to 50.000(Zirakpur to Patiala Sec.) to 4 Lane EPC (Public Works Dept. of State)-[N24000289] | |||
Widening and Rehabilitation of the Existing Patiala Byepass from Existing Km.50/0 to 69/280) On NH-6 EPC(Public Works Dept. of State)-[N24000290] | |||
4-Laining With Paved Shoulders of Sangrur to Dogal Kalan Sec. of NH-71(New NH-52) from Km.181.805 to EPC (Public Works Dept. of State)-[N24000291] | |||
4 Laining With Paved Shoulders of Dogal Kalan to Punjab/Haryana Border Sec.of NH-71 (New NH-52) from EPC (Public Works Dept. of State)-[N24000292] | |||
Rehabilitation and Up-Gradation of NH-214 (New NH-216) from Km 0.0 to 26.150 (Kathipudi to Start of K EPC (Ministry of Road Transport and Highways)-[N24000293] | |||
Rehabilitation and Upgradation of Existing NH-167 from Km 70/000 to Km 125-150 EPC (Public Works Dept. of State)-[N24000299] | |||
Rehabilitation and Upgradation of NH-42 from Km 4 to350 to Km 75 to 600 to Two Lane With Pave Soldou EPC (Public Works Dept. of State)-[N24000300] | |||
Rehabilitation and Upgradation of NH-565 from Km.198/694 to 294/0 (Markapuram to Vaggampalle Section EPC (Public Works Dept. of State)-[N24000303] | |||
Katni to Umariya Section of NH-78 In Madya Pradesh Km 0 to 68/4 EPC (National Highways Development Project)-[N24000310] | |||
Improvement/ Widening to Two Laning With Paved Shoulder of Udaipur-Sabroom Section from Km 55.00 to EPC (National Highways and Infrastructure Development Corporation Ltd.) -[N24000329] | |||
Constn forr Four Laning of Babatpurvaranasi Section of NH-56 (231) Km 263.00 to 280.25 (EPC Mode) EPC (Ministry of Road Transport and Highways -[N24000330] | |||
Strengthening With Provision of Paved Shoulder In Km. 0.00 to 46.470 of NH-96(330) EPC Mode EPC(Ministry of Road Transport and Highways)-[N24000336] | |||
Rehabilitation and Upgrading to 2 Lanes/2 Lane With Paved Shoulders Configuration of Pratapgarh-Padi (Ministry of Road Transport and Highways)-[N24000369] | |||
4-Lanes With Paved Side Shoulders of End of Sangrur Bypass to Tapa Sec, If NH-64 (New NH-07) from Exi EPC(Public Works Dept. of State)-[N24000370] | |||
4-Lanes With Paved Side Shoulders of Tapa to Bathinda Sec.of NH-64 (New NH-07) from Exising Km.168/0 EPC(Public Works Dept. of State)-[N24000372] | |||
4 Lanes With Paved Side Shoulders of End of Patiala Bypass to Start of Sangrur Byepass Sec.of NH-64 EPC (Public Works Dept. of State)-[N24000374] | |||
Bahraich Bypass to Rupaidha Section NH-28C In Uttar Pradesh Km 99 to150 EPC (National Highways Development Project)-[N24000377] | |||
Biora-Rajasthan Border (2L) of NH-12Ext in MP Bot (toll)(National Highways Development Project)-[N24000381] | |||
Const.of 4 Lanes With Paved Shoudlers of Harike Bypass from Existing Km.158.350 to 166.925 of NH-15 EPC (Public Works Dept. of State)-[N24000383] | |||
Const.of Sangrur Bypass (Existing Km.106.170 to 116.950) and Dhanoula Bypass (Existing Km.138.030 to K EPC (Public Works Dept. of State)-[N24000384] | |||
Four Laning of Itanagar-Holongi Section of NH-52A (19.26 Km) in Arunachal Pradesh under Phase `A Item Rate (Public Works Dept. of State)-[N24000387] | |||
2 Laning of Shillong Nongstoin Section of Nh 44 and Nongstoin Tura State Road under Phase A of Sa Item Rate(Public Works Dept. of State)-[N24000390] | |||
Allahabad to Up/Mp Border Section of NH-27 In Uttar Pradesh EPC (National Highways Development Project)-[N24000393] | |||
Shahdol to Anuppur-Mp/Chattisgarh Border Section of NH-78 In Madya Pradesh Km 142/ 200 to 245/0 EPC (National Highways Development Project)-[N24000394] | |||
Barabanki to Junction With MDR 13 Near Jarwal Section of NH-28C In Uttar Pradesh Km 0 to 43 EPC (National Highways Development Project)-[N24000399] | |||
Junction With MDR-13 Near Jarwal to Bahraich Section of NH-28C In Uttar Pradesh Km 43 to 93 EPC(National Highways Development Project)-[N24000403] | |||
Development to Four Lane With Paved Shoulders of Tallewal-Barnala Section of NH-71 from Existing Km EPC (Public Works Dept. of State)-[N24000404] | |||
Widening and Stg.of Existing Two lane Carriageway to Four Lanes With Paved Side Shoulders of Amrtisa EPC (Public Works Dept. of State)-[N24000405] | |||
Rehabilitation and Upgrading to 2 Lanes/2 Lane With Paved Shoulders Configuration of Lalsot-Karauli Item Rate (Ministry of Road Transport and Highways)-[N24000406] | |||
Strengthening and Construction of Paved Shoulders Including Rehabilitation/Repairing of Bridges from Item Rate (Public Works Dept. of State)-[N24000409] | |||
Mandla-Chilpi Section of NH-12A in Madhya Pradesh Km 89/6 to Km 192/4 of NH-12A EPC (National Highways Development Project)-[N24000410] | |||
Rehabilitation and Upgradation of NH-167 from Km 70 EPC (Public Works Dept. of State)- [N24000416] | |||
Sonouli to Gorakhpur Section of NH-29E in Uttar Pradesh Km 0/0 to 80/0 EPC (National Highways Development Project)-[N24000418] | |||
Two Laning of Hoj Potin Section of NH 229 (19.06 Km) in Arunachal Pradesh under Arunachal Pradesh Pa Item Rate (Public Works Dept. of State)-[N24000419] | |||
Two Laning of Yupia-Hoj Section (20.40 Km) in Arunachal Pradesh under Arunachal Pradesh Package of Item Rate (Public Works Dept. of State)-[N24000420] | |||
2 Laning from Pasighat to Pangin Section of NH-229 from Km 0 to Km 28 EPC (National Highways and Infrastructure Development Corporation Ltd.)-[N24000421] | |||
Bela(Riwa)-Mp/Up Border (4L) of NH-7 in MP BOT (Toll) (National Highways Development Project)-[N24000447] | |||
Jabalpur-Barela Section of NH-12A in Madhya Pradesh Km 477/6 of NH-7 to Km 22/8 of NH -12A (National Highways Development Project)-[N24000474] | |||
Improvement of Amritsar Bypass by Construction of Additional Structure and Service  Roads on NH-1 (National Highways Authority of India)-[N24000476] | |||
Widening andstrengthening from Km.505.00 to 538.00 of NH-730 (EPC Mod E) EPC (Ministry of Road Transport and Highways)-[N24000512] | |||
Widening Stg.of Existing Two-Lane Carriageway to Four Lanes with Paved Side Shoulders of Faridkotko EPC (Public Works Dept. of State)-[N24000526] | |||
Widening and Strengthening from Km.505.00 to 538.00 of NH-730 (EPC MODE) EPC (Ministry of Road Transport and Highways)-[N24000529] | |||
Rehabilitation and Upgrading to 2 Lane with Paved Shoulders Configuration and Strengthening of Anish (Ministry of Road Transport and Highways)-[N24000536] | |||
Rehabilitation and Augmentaion of NH-222 from Km 101.00 to 161.570 under Nhdp-IV on EPC Mode. Job No (Public Works Dept. of State)-[N24000538] | |||
Balance Work of 4-Lanning from Km 94.000 to Km 123.000 of Nagpur-Hyderabad Section NS-60 (National Highways Authority of India)-[N24000561] | |||
Rehabilitation and Upgrading to 2 Lanes/2 Lane With Paved Shoulders Configuration of Anisabad-Aurang (Ministry of Road Transport and Highways)-[N24000573] | |||
Funded ) 2 Laning from Changlang States/UTs Boundary -Khonsa (42.844Km) Section of NH- 52B In The State (National Highways and Infrastructure Development Corporation Ltd.)- [N24000615] | |||
Widening and Strenfthening of Exisitng Sl Il to 2 Lane Carriageway with Paved Shoulder from Km 256.8 (Ministry of Road Transport and Highways)-[N24000647] | |||
Widening to 2 Lane With Paved Shoulder and Strengthening from Km 88 to 130 on NH-86 (Public Works Dept. of State)-[N24000856] | |||
Rehabilitation and Upgradation of Puranpur-Khutar Section from Km 38.00 to Km 82.00 of NH-730 to 2 (Public Works Dept. of State)-[N24001142] | |||
June, 2019 | |||
Railways | |||
Guna-Etawah Via Shivpurigwalior-Bhind Nl, (Ncr) (North Central Railway)-[220100007] | |||
Amravati-Narkher Nl(Cr) (Central Railways)-[220100118] | |||
Calicut-Mangalore (Dl) (SR) (Southern Railway)-[220100151] | |||
Mandarhill-Dumkarampurhat (Nl), ER (Eastern Railways)-[220100168] | |||
Karur-Salem(Nl),Sr (Southern Railway)-[220100191] | |||
Agra-Etawah Via Fatehabad and Bah (Nl) NCR (North Central Railway)-[220100243] | |||
Katihar-Jogbani (Gc)(Nefr) (North East Frontier Railway)-[220100247] | |||
Kaptanganj-Thawesiwan-Chhapra Gc (NER) (North Eastern Railway)-[220100256] | |||
Quilon-Tirunelveli-Tenkasivirudhunagar (SR) (GC) Southern Railway-[220100263] | |||
Jind-Sonepat (Nl),NR (Northern Railway)-[220100280] | |||
Koderma Giridh (Nl), ECR (East Central Railways)-[220100306] | |||
Maharajganj-Masrakh (Nl)-NER (North Eastern Railway)-[220100316] | |||
Obulavaripalle-Krishnapatnam (RVNL)-(Rail Vikas Nigam Ltd.)-[N22000049] | |||
Dindigul-Pollachi-Palghatpollachi and Coimbatore (Southern Railway)-[N22000080] | |||
Utratia-Zafrabad, Nr (Line Doubling) (Northern Railway)-[N22000088] | |||
Agartala Sabroom, Nl, NEFR (North East Frontier Railway)-[N22000099] | |||
Dakshin-Barasal-Lakshmikantapur (Eastern Railways)-[N22000116] | |||
Ghutiasharif-Canning (ER) (Eastern Railways)-[N22000117] | |||
Pandabeswar-Chinpai Doubling (ER) (Eastern Railways)-[N22000118] | |||
Bhojipur Tanakpur Via Pilibhit (North Eastern Railway)-[N22000132] | |||
Aunrihar Manduadih (North Eastern Railway)-[N22000133] | |||
Dangoaposi-Rajkharswan 3Rd Line Doubling (South Eastern Railway)-[N22000164] | |||
Chennai Beach-Tambaramchengalpattu Suburban GC (Southern Railway)-[N22000188] | |||
Construction of NL from Kumarghat-Agartala (North East Frontier Railway)-[N22000194] | |||
Chengannur-Chingavanam (Southern Railway)-[N22000203] | |||
Lumding-Hojai Patch Doubling Project (North East Frontier Railway)-[N22000211] | |||
Meerut-Muzafarnagar Patch DL (Northern Railway)-[N22000267] | |||
Ambala Cantt-Dhapper Ph-1 with New Mm of Dhapper-Chandigarh (Northern Railway)- [N22000290] | |||
Jakhal-Mansa Doubling On SPR Section (Northern Railway)-[N22000291] | |||
Quilon-Tirunelveli-Trichendur, Tenkasi (Southern Railway)-[N22000303] | |||
Madurai-Rameswaram (161 Km) Gauge Conversion (Southern Railway)-[N22000439] | |||
Trichy-Manamadurai (150 Km) Gauge Conversion (Southern Railway)-[N22000440] | |||
Villupuram-Katpadi (161 Km) Gauge Conversion (Southern Railway)-[N22000446] | |||
Madurai-Dindigul (Incl. Ambaduturaikodaikannal Road) (62.05 Km) Doubling (Southern Railway)-[N22000450] | |||
Manamadurai-Virudhunagar 66.55 Km) Gauge Conversion. Southern Railway)-[N22000453] | |||
Mulanturutti-Kuruppantara (24 Km) Doubling. (Southern Railway)-[N22000454] | |||
Gonda-Bahraich (60 Kims.) of Gonda-Bahraich-Sitapur-Lucknow (North Eastern Railway)-[N22000455] | |||
Mandhana-Brahmawart New Line Project. (North Eastern Railway)-[N22000458] | |||
Patna Ganga Bridge With Linking Lines Between Patna and Hajipur (Rail Cum Road Bridge) 19 Km (East Central Railways)-[N22000474] | |||
July, 2019 | |||
Coal | |||
North Urimari Ocp (3.0 MTY) (Central Coal Fields Limited)-[N06000084] | |||
Steel | |||
Additional Water Storage Reservoir(KBR-II) (Rastriya Ispat Nigam Limited)-[N12000120] | |||
Petroleum | |||
Phuplur-Haldia Pipeline Project Phase-I (Gas Authority of India Limited)-[N16000072] | |||
Paradip-Raipur- Ranchi Pipeline (Indian Oil Corporation Limited)-[N16000088] | |||
Resitement of Tata Nagar and Rachi Depots to Khunti (Jharkhand)(Indian Oil Corporation Limited)-[N16000187] | |||
Replacement of KV Section of KSPL Central Sector Projects (Indian Oil Corporation Limited) -[N16000287] | |||
Power | |||
Wind Power Project At Sadla in Distt. Surendranagar (Gujarat) Satluj Jal Vidyut Nigam Limited)-N18000235] | |||
Road Transport and Highways | |||
Bhopal-Biora (4L) of NH-12 in MP Bot (toll)(National Highways Development Project) -[N24000380] | |||
Telecommunications | |||
Madhya Pradesh Access (Lot1) Central Sector Projects (Bharat Sanchar Nigam Limited)-[N26000110] | |||
August, 2019 | |||
Coal | |||
Amlai Oc Expansion Sector B (1.50 MTY) (South-Eastern Coal Fields Limited)-[N06000082] | |||
Gokul (Western Coal Fields Limited)-[N06000120] | |||
Road Transport and Highways | |||
Improvement from Km 0/0 to 68/0 EPC (Public Works Dept. of State)-[N24000413] | |||
Widening to 2 Lane Carriageway With Paved Shoulders and Strengthening from Km 162.010 to Km 224.900 (Ministry of Road Transport and Highways)-[N24000642] | |||
Improvement from Km 0 to Km 68.0 (Kanaktora to Jharsuguda Section) to 2 Lane Carriageway With Paved (Ministry of Road Transport and Highways)-[N24000643] | |||
Widening to 2L/2Lps from 131/0 to 192/0 (Bhojpur to Chhatabar) of NH-200 under Nhiip in Odisha (Ministry of Road Transport and Highways)-[N24000918] | |||
Widening to 2L/2Lps from 25/0 to 80/(Nabarangpur to Koksara) of NH-201 under NHIIP in Odisha (Ministry of Road Transport and Highways)-[N24000919] | |||
Widening to 2L from 228/70 to 258/70 and 286/70 to 327/70 of Vr Route under VRC in Odisha (Ministry of Road Transport and Highways)-[N24000924] | |||
Rehabilitation and Upgradation of Eepurupalem-Ongole Section from Km195.000 to 254.500 of Nh214A(NH-2 (Ministry of Road Transport and Highways)-[N24000971] | |||
September, 2019 | |||
Petroleum | |||
Uran Chakan Shikrapur LPG Pipeline (Hindustan Petroleum Corporation Limited)- [N16000155] | |||
VVSPL Capacity Expansion and OSTTSS Jetty Sub Sea Pipeline Project (Hindustan Petroleum Corporation Limited)-[N16000237] |