Length and Cost of Various National Highway (NH) Project Works undertaken by National Highway Authority in Kerala (NHAI) in Kerala (09.12.2020 to 01.02.2023) | ||||||
Projects | NH No. | Length (In KM) | Awarded /TPC | Appointed Date | Scheduled/ Likely Date of Completion | Physical Progress (In %age) |
Construction of Six Lane Minor Bridge At Km 203.160 and Major Bridge At Km 204.895 | ||||||
6-Laning of Chengala to Neeleshwaram on NH-66 (Old NH-17) on Hammode | ||||||
6-Laning of Neeleshwaram to Thalipparamba on NH- 66 (Old NH-17) on Hammode | ||||||
6-Laning of Thalappady to Chengala on NH-66 (Old NH-17) on Ham Mode | ||||||
6-Laning of Azhiyur to Vengalam on NH-66 (Old NH-17) on Ham Mode | ||||||
6-Laning of Thalipparamba to Muzhapilangadu on NH-66 (Old NH-17) Onham Mode | ||||||
6-Laning Oframanattukara to Valanchery on NH-66 (Old NH-17) on Ham Mode | ||||||
6-Laning of Valanchery to Kappirikkad on NH-66 (Old NH-17) on Hammode | ||||||
6 Laning of Thuravoor Thekku – Paravoor Section of NH-66 (Old NH- 47) on EPC Mode | ||||||
6 Laning of Kottukulangara – Start of Kollam Bypass of NH- 66 (Old NH-47) on Hammode | ||||||
Six Laning of Kadambattukonam to Kazhakuttom of NH- 66 (Old NH-47) on EPC Mode | ||||||
Six Laning of Paravoor to Kottukulangara Section of NH-66 (Old NH-47) Onepc Mode | ||||||
4/6-Laning of Kappirikkad- Thalikulam of NH-17 (New NH-66) on Ham Mode | ||||||
4/6-Laning of Thalikulam- Kodungallur of NH-17 (New NH-66) on Hammode | ||||||
Six Laning of Start of Kollam Bypass to Kadambattukonam of NH- 66 (Old NH-47) on Hammode | ||||||
6-Laning of Kodungallur- Edapally of NH-66 (Old NH-17) on Ham Mode | ||||||
6-Lane Elevated Highway Between Aroor– Thuravoor Section of NH- 66 on Epc Mode | ||||||
Widening/Development of Existing NH-85 from Km.0+000 Tokm.124+636 Section of NH-85 to 2L/2L+Pssection on EPC Mode | ||||||
Total | ||||||
India |