Length and Estimated Cost of Various Completed National Highway (NH) Projects Executed by National Highway Authority in Kerala (NHAI) in Kerala (22.09.2006 to 26.07.2023) | |||||
Projects | NH No. | Completed Length (In Km) | Estimated Cost (Rs. in Crore) | Remarks | Reason for Delay, If Any |
4-Laning of Thrissur (Km 270.00) to Angamali (Km 316.70) Andimprovement, Operation & Maintenance of Angamaly (316.700) to Edapally(Km to 342.000) on NH-47 (New NH-544) Bot (Toll) | |||||
4 Laning of Walayar (Km 182.250) Tovadakkanchery (Km 240.000) on NH-47 (New NH-544) Bot (Toll) | |||||
4- Lane Nh Connectivityto Ictt Vallarpadam from Kalamassery(0+000 Km) Tovallarpadam (17+121 Km) on NH-966A (Old NH-47C) | |||||
Edappally-Vytilla-Aroor Section on NH-66 | |||||
Four Laning of Kazhakkoottam to Mukkola Section from Km.0+000 to Km.26+500 of NH-47 Inthe State of Kerala under NHDP Phase IIIIi on EPC Mode | |||||
6 Laning of Vadakkanchery (Km 240.000) to Thrissur (Km 270.00) on Bot (Toll) Basis in The State of Kerala under NHDP Phase-II | |||||
Construction of New 4- Lane Elevated Highway (2X10.5M Wide Twin Two Lane Structures) Including Approaches & Service Roads Connecting Kazhakuttam Junction and Technopark Junction from Km.547+080 to Km.549+801 on EPC Mode | |||||
4 Laning of Thiruvananthapuram By Pass from Mukkola to Kerala /Tamil Nadu Border (Km. 26.500 to Km. 43.000) on NH-66 on EPC Mode | |||||
4-Lane Rob Near Neeleshwaram Town (Pallikara Railway Gate) from Km. 93.468 (Existing Km. 95.650) to Km. 94.248 (Existing Km. 96.450) of NH- 17(New NH-66) on EPC Mode | |||||
Total Length Completed by NHAI | |||||