Project-wise Central Sector Power Generation/Plant Load Factor in India (2001-02) | |||||
Projects/Stations | Generation (MU) | PLF% | |||
Programme | Actual | % | Programme | Actual | |
Thermal Central Sector | |||||
NTPC | |||||
Badarpur STPS | |||||
Singrauli | |||||
Rihand STP | |||||
Dadri TH. | |||||
Korba STPS | |||||
Vindh. STPS | |||||
R`Gundam S | |||||
Simhadri Th. | |||||
Farakka ST | |||||
Kahalgaon | |||||
T`Cher STPS | |||||
Unchahar | |||||
T`cher OLD | |||||
Tanda | |||||
Total Coal | |||||
Total Coal Excluding BTPS | |||||
F`Bad Gas | |||||
Anta GT | |||||
Auraiya GT | |||||
Dadri GT | |||||
Kawas GT | |||||
Gandhar | |||||
Kayhankulam | |||||
Total Gas | |||||
Total NTPC | |||||
DVC | |||||
Chandrapur | |||||
Durgapur | |||||
Bokaro | |||||
Mejia | |||||
Maithon GT | |||||
DVC Thermal | |||||
Thermal Central Sector | |||||
NTPC | |||||
Neyveli | |||||
D.V.C. | |||||
NEEPCO | |||||
Thermal Total Central | |||||
Hydro | |||||
Cent. Sect. | |||||
B.B.M.B. | |||||
NHPC | |||||
Bairasuil | |||||
Chamera | |||||
Tanakpur | |||||
Salal | |||||
Uri | |||||
Ranjit | |||||
Loktak | |||||
NHPC Total | |||||
DVC | |||||
Neepco | |||||
Tot.Cen. Hydro | |||||
Central Nuclear | |||||
RAPS | |||||
Narora | |||||
Kakarpar | |||||
Tarapur | |||||
Kaiga | |||||
Kalpakam | |||||
Total Nucl. | |||||
Central Sector | |||||
Thermal | |||||
Nuclear | |||||
Hydro | |||||
Total | |||||
DVC | |||||
Chandrapur | |||||
Durgapur | |||||
Bokaro | |||||
Mejia | |||||
Maithon GT | |||||
DVC Thermal | |||||
DVC Hydro | |||||
DVC Total | |||||
NEEPCO | |||||
Kathalguri | |||||
Agartala G | |||||
Total Thermal | |||||
Khandong | |||||
Kopili | |||||
Doyang | |||||
Ranganadi | |||||
Total Hydro | |||||
Total NEEPCO |