Selected State-wise Number and Installed Capacity of Waste-to-Energy Plants in India (As on 30.06.2019) | |||||||
States/UT | MSW Based Power Plants | Agricultural, Urban and Industrial Effluent /Waste Based Waste to Energy Plants | Total Installed | No. of Waste-to -Energy Plants Likely to be Set up | |||
Power (Grid) | Power | Bio-gas (Off-grid) | Bio-CNG (Off-grid) | Mweq (No. of Plants) | |||
(Off-grid) | |||||||
MW (No. of Plants) | MW (No. of Plants) | MW (No. of Plants) | m3/Day (No. of Plants) | Kg/Day (No. of Plants) | |||
Andhra Pradesh | |||||||
Bihar | |||||||
Chhattisgarh | |||||||
Delhi | |||||||
Gujarat | |||||||
Haryana | |||||||
Himachal Pradesh | |||||||
Karnataka | |||||||
Kerala | |||||||
Madhya Pradesh | |||||||
Maharashtra | |||||||
Punjab | |||||||
Rajasthan | |||||||
Tamil Nadu | |||||||
Telangana | |||||||
Uttar Pradesh | |||||||
Uttarakhand | |||||||
West Bengal | |||||||
India | |||||||