Station-wise Central Sector Thermal Power Generation in India (2011-2012) | |||||||
(In Gwh) | |||||||
Stations | Monitored Capacity (MW) | Target (April 2011 to March 2012) | Program | Actual | Actual Same Period (2010-11) | %age of Program (Actual/ Program) | %age of Last Year (Actual/ Actual Same Period) |
Thermal | |||||||
Central Sector | |||||||
NTECL | |||||||
Vallur TPP | |||||||
Total Ntecl | |||||||
APCPL | |||||||
Indira Gandhi STPP | |||||||
Total APCPL | |||||||
NTPC Ltd. | |||||||
Badarpur TPS | |||||||
Dadri (NCTPP) | |||||||
Farakka STPS | |||||||
Kahalgaon TPS | |||||||
Korba STPS | |||||||
Ramagundem STPS | |||||||
Rihand STPS | |||||||
Simhadri | |||||||
Singrauli STPS | |||||||
Sipat STPS | |||||||
Talcher (Old) TPS | |||||||
Talcher STPS | |||||||
Tanda TPS | |||||||
Unchahar TPS | |||||||
Vindhyachal STPS | |||||||
Anta CCPP | |||||||
Auraiya CCPP | |||||||
Dadri CCPP | |||||||
Faridabad CCPP | |||||||
Gandhar CCPP | |||||||
Kawas CCPP | |||||||
R. Gandhi CCPP (Liq.) | |||||||
Total NTPC Ltd. | |||||||
NLC | |||||||
Barsingsar Lignite | |||||||
Neyveli (EXT) TPS | |||||||
Neyveli TPS-I | |||||||
Neyveli TPS-II | |||||||
Neyveli TPS-II EXP | |||||||
Total NLC | |||||||
NEEPCO | |||||||
Agartala Gt | |||||||
Kathalguri CCPP | |||||||
Total NEEPCO | |||||||
RGPPL | |||||||
Ratnagiri CCPP-I | |||||||
Ratnagiri CCPP-II | |||||||
Ratnagiri CCPP-III | |||||||
Total RGPPL | |||||||
NSPCL | |||||||
Bhilai TPS | |||||||
Total NSPCL | |||||||
K.B.U.N.L | |||||||
Muzaffarpur TPS | |||||||
Total K.B.U.N.L | |||||||
DVC | |||||||
Bokaro `B` TPS | |||||||
Chandrapura (DVC) | |||||||
Durgapur Steel TPS | |||||||
Durgapur TPS | |||||||
Kodarma TPP | |||||||
Mejia TPS | |||||||
Raghunathpur TPP | |||||||
Maithon GT (Liq.) | |||||||
Total DVC | |||||||
Total Central Sector |