Station-wise Energy Plant Load Factor in Central Sector (Thermal) in India (2014-2015) | |||||
Stations | Monitored Capacity (MW) | Target (April 2014 to March 2015) | Plant Load Factor (%age) | ||
Program | Actual | Actual Same Period (2013-14) | |||
NTECL | |||||
Vallur TPP | |||||
Total NTECL | |||||
APCPL | |||||
Indira Gandhi STPP | |||||
Total APCPL | |||||
NTPC Ltd. | |||||
Nabi Nagar TPP | |||||
Total Ntpcir | |||||
NLCTNEB | |||||
Tuticorin (Jv) TPP | |||||
Total NLCTNEB | |||||
NTPC Ltd. | |||||
Badarpur TPS | |||||
Barh II | |||||
Dadri (NCTPP) | |||||
Farakka STPS | |||||
Kahalgaon TPS | |||||
Korba STPS | |||||
Mauda TPS | |||||
Muzaffarpur TPS | |||||
Ramagundem STPS | |||||
Rihand STPS | |||||
Simhadri | |||||
Singrauli STPS | |||||
Sipat STPS | |||||
Talcher (Old) TPS | |||||
Talcher STPS | |||||
Tanda TPS | |||||
Unchahar TPS | |||||
Vindhyachal STPS | |||||
Anta CCPP | |||||
Auraiya CCPP | |||||
Dadri CCPP | |||||
Faridabad CCPP | |||||
Gandhar CCPP | |||||
Kawas CCPP | |||||
R. Gandhi CCPP (Liq.) | |||||
Total NTPC Ltd. | |||||
NLC | |||||
Barsingsar Lignite | |||||
Neyveli (Ext) TPS | |||||
Neyveli TPS- I | |||||
Neyveli TPS-II | |||||
Neyveli TPS-II Exp | |||||
Total NLC | |||||
NEEPCO. | |||||
Agartala Gt | |||||
Kathalguri CCPP | |||||
Monarchak CCPP | |||||
Total Neepco. | |||||
RGPPL | |||||
Ratnagiri CCPP I | |||||
Ratnagiri CCPP II | |||||
Ratnagiri CCPP III | |||||
Total RGPPL | |||||
NSPCL | |||||
Bhilai TPS | |||||
Total NSPCL | |||||
DVC | |||||
Bokaro `B` TPS | |||||
Chandrapura (DVC) | |||||
Durgapur Steel TPS | |||||
Durgapur TPS | |||||
Kodarma TPP | |||||
Mejia TPS | |||||
Raghunathpur TPP | |||||
Maithon Gt (Liq.) | |||||
Total DVC | |||||
ONGC | |||||
Tripura CCPP | |||||
Total ONGC | |||||
Total Central Sec. |