Installed Capacity, Actual Generation/Target (Above 25 MW) of Hydro Electric Power in West Bengal (2011-12 to 2014-15-upto 30.06.2014) | |||||||||||||
State | Installed Capacity As OnĀ 30.06.2014 (MU) | 2011-12 | 2012-13 | 2013-14 | 2014-15 (Upto 30.06.2014)* | ||||||||
Progra- mme (MU) | Achieve- ment (MU) | % of Achieve- ment over Progra- mme | Progra- mme (MU) | Achieve- ment (MU) | % of Achieve- ment over Progra- mme | Progra- mme (MU) | Achieve- ment (MU | % of Achieve- ment over Progra- mme | Progra- mme (MU) | Achieve- ment (MU | % of Achieve- ment over Progra- mme | ||
West Bengal | |||||||||||||
India |